Laserfiche WebLink
have either survived or have been replaced. Upon approval of this final inspection, the <br />landscape maintenance guaranty shall be returned to the PERMITTEE. In the event the <br />PERMITTEE fails to maintain the required plantings for a two-year period, the City <br />Council may order the replacement of plantings with CITY day labor and/or by letting <br />contracts and draw upon the landscape maintenance guaranty for payment. Only the City <br />Council shall have the authority to direct replacement of the plantings and draw upon the <br />landscape maintenance guaranty. The PERMITTEE hereby grants permission and a <br />license to the CITY and/or its contractors and assigns to enter upon the Subject Property <br />for the purpose of replacing plantings in the event of the PERMITTEE's default. <br />21. Street Cleaning and Clean Up. After the street surfacing that is a part of the Stage I <br />Improvements is installed, the PERMITTEE shall clear any soil, earth, or debris from the <br />streets. From time to time, the CITY may remove accumulations of soil, earth, and debris <br />from the streets resulting from the construction of the Stage I Improvements. It shall be <br />the PERMITTEE'S responsibility to pay the costs associated with this necessary street <br />cleaning. Invoices from the CITY to the PERMITTEE for such costs shall be paid within <br />fifteen (15) days of the date of the invoice. <br />22. Payment of Development Fee's. The PERMITTEE must pay to the CITY the fees <br />described on Exhibit B which may include, but are not limited to Trail Development Fees, <br />Sanitary Sewer Connection (Trunk) Fees, Water Connection (Trunk) Fees, Sanitary Sewer <br />Lateral Fees, Water Lateral Fees, Storm Management Fees, Street Signage Fees, and Street <br />Light Operation and Maintenance Fees. <br />23. Requirements for Building and Occupancy Permits. <br />a. No building permit for any lot in the Plat shall be issued until the PERMITTEE <br />has: (a) installed a Class 5 driving surface to within 300 feet of the structure; (b) <br />provided the CITY Building Official with a Certificate of Survey; c.) the financial <br />guaranty described in Section 12 to the CITY; and <br />b. No occupancy permit for any lot in the Plat shall be issued until the PERMITTEE <br />has: (a) constructed vehicular access to the lot, including the installation of at least <br />one layer of bituminous surfacing; (b) constructed all utilities and storm water <br />facilities this Agreement requires to serve the lot and such utilities and storm water <br />facilities are in place, operational and accepted by the CITY; (c) for lots that have <br />a slope of less than 2%, provided the CITY with a certificate of grading, prepared <br />by a licensed (State of Minnesota) professional land surveyor, certifying that the <br />flattest grade on the lot is 1% or greater; and (d) installed and planted the sod and <br />landscaping that are required as a part of the Stage I Improvements. <br />24. PERMITTEE Defaults. If the PERMITTEE defaults in the performance of one or more <br />of the PERMITTEE'S obligations under this Agreement, i) the CITY gives the <br />PERMITTEE thirty (30) days written notice of the default and ii) the PERMITTEE fails <br />to cure the default within said thirty (30), then the CITY may pursue any and all remedies <br />available at law or in equity including, but not limited to, the following: <br />a. The CITY may, at its option, perform or engage one or more third parties to <br />perform the PERMITTEE'S obligations. If, in the reasonable judgment of the <br />5 <br />