Laserfiche WebLink
EXHIBIT B <br />Fees Payable to the City <br />1. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. PERMITTEE must pay a Trail Development Fee of $50,000.00 <br />(50 units x $1,000.00 per unit). The PERMITTEE acknowledges that these fees are estimates. The <br />rate in effect when the Plat is recorded will be collected. <br />2. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary Sewer <br />Trunk Fee of $65,300.00 (50 units x $1,306.00). The PERMITTEE acknowledges that these fees <br />are estimates. The rate in effect when the Plat is recorded will be collected. <br />3. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable Water <br />Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of $97,250.00 (50 units x <br />$1,945.00 per unit). The PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />4. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management Fee <br />of $25,850.00 (50 units x $517.00 per unit). The PERMITTEE acknowledges that these fees are <br />estimates. The rate in effect when the Plat is recorded will be collected. <br />Park Dedication and Trail Da. e1oi�nient <br />Train Development <br />Re_ ideatail <br />S == unit <br />Smbto LI,' Pa rk Trai Dev&opneat <br />S50,000 <br />Water and Sewer Fees <br />Water Trnunk (Connection) <br />0 .r.'. _.awry Sewer Think (Ca martian) <br />50 <br />50 <br />per unit <br />per unit <br />S1,945 597.250 <br />,306 S65,300 <br />Svtatar Water and Sewer Fees <br />$162,550 <br />Starmwater Management Fees <br />Stormwater Management <br />50I per unit <br />1517 S25.350 <br />Subtotal StormwaMa Ana eiet <br />GRAND TOTAL FOR DEVELOPMENT FEES <br />$238.400 <br />Sureties and inspection Fef <br />(returned when coiispI=_ _s 0v3,3D1 cost of improvement 12506 51.129.127 <br />Cash or Letter of Credit <br />1.01.1easpectioaaFee v3,301 cos tafimprovement 50p 545465 CashE;scrDw <br />1 Fees due att reccrcl n . Fees out ned alsc.e i dicate 2022 -ees. if plat is not recorded in 2022, fees att of record ng rib be clue. <br />5. Maintenance Guaranty for Landscape. The PERMITTEE is responsible for satisfying a two- <br />year Landscape Maintenance Guaranty. PERMITTEE shall provide in cash the amount of <br />$5,400.00 [# plantings (60 trees) x cost/planting ($300/tree x 30% average non -survival rate, (0 <br />shrubs) x cost/planting $75/shrub x 30% average non -survival rate]. The PERMITTEE <br />acknowledges that these fees are estimates. The rate in effect when the Plat is recorded will be <br />collected. <br />6. Street Sign Fee. While the CITY provides and installs the street name and traffic control signage, <br />the PERMITTEE is responsible for paying for them at a rate of $225 per sign. PERMITTEE <br />12 <br />