My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/13/2022
Ramsey
>
Public
>
Agendas
>
Council
>
2022
>
Agenda - Council - 12/13/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:46:12 PM
Creation date
12/12/2022 2:06:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/13/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7.3. <br />Meeting Date: 12/13/2022 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />Title: <br />Adopt Resolutions #22-286, #22-287, #22-288 and #22-289 Ordering Plans and Specifications for 2023 Pavement <br />Management Program Projects <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolutions #22-286, #22-287, #22-288 and #22-289 ordering plans and <br />specifications for 2023 Pavement Management Program projects. <br />Background: <br />The proposed 2023 — 2032 Capital Improvement Program (CIP) identifies four (4) street reconstruction projects <br />and two (2) overlay improvements for 2023. <br />To date City Council has authorized preparation of plans and specifications for two street reconstruction projects; <br />Improvement Project #23-01, 161st Avenue Reconstruction and Improvement Project #23-04, 167th Avenue <br />Reconstruction. The following Pavement Management Projects have not yet received authorization to create plans <br />and specifications: <br />• Improvement Project #23-05, Barthel's Rum River Acres 2nd Street Reconstructions <br />• Improvement Project #23-06, 2023 MSA Pavement Overlay Improvements <br />• Improvement Project #23-07, 2023 Neighborhood Pavement Overlay Improvements <br />• Improvement Project #23-10, Whispering Pines Estates Plat 3 Street Reconstructions <br />Street segment summaries for each of these projects are attached to this case. <br />On August 23, 2022, the Ramsey City Council accepted a proposal for a topographic survey of the Improvement <br />Project #23-05 project area from Hakanson Anderson. <br />On November 7, 2022, the Ramsey City Council accepted a proposal for topographic surveys of the Improvement <br />Project #23-06, #23-07, and #23-10 project areas from Bolton & Menk. Ramsey City Council also accepted a <br />proposal for a geotechnical report of the Improvement Project 23-10 project area from Haugo Geotechnical <br />Services. <br />On November 15, 2022, the Ramsey Public Works Committee considered recommending City Council <br />Authorization to prepare plans and specifications for the 2023 PMP listed above. The Committee supported <br />completing the proposed projects in 2023 and recommended City Council authorization to prepare plans and <br />specifications. <br />IP 23-05 Barthel's Rum River Acres 2nd Street Reconstructions Project Scope <br />This project proposes reconstruction of the streets within the Barthel's Rum River Acres 2nd subdivision, which is <br />generally located between 161st Avenue and 164th Avenue, adjacent to the Rum River. The streets are 24 feet <br />wide rural sections (no curb and gutter), totaling 1.64 miles in length. Traffic counts have not been taken, but <br />Staff anticipates typical neighborhood traffic due to the location of the subdivision and lack of adjacent or internal <br />destinations, which would increase traffic above normal residential neighborhood traffic volumes. No sewer or <br />
The URL can be used to link to this page
Your browser does not support the video tag.