Laserfiche WebLink
PARTI~~'~L PAY ESTIMk&TE NO. 2 <br /> <br />Date: December 2, 2005 <br />Project: Ebony Street and Utility Improvements 05-23 <br />Contractor: W B Miller Inc. _- <br />Current Contract Amount: $247,795:05 <br />Award Date: August 23, 2005 <br /> <br />The following.work has been completed on the above referenced project: <br /> <br /> Unit <br />Item Description Qnty Unit Price Extension <br /> <br />1 Mobilization 0.75 Is <br />2 Traffic Control 0.5 Is <br />3 Sawcui Bit. 550 ft <br />4 Remove C & G 560 ft <br />5 Remove Bit Pvmnt 5255 sq yd <br />6 Connect to San Sewer 1 Is <br />7 8 in San sewer 434 ft <br />8 48 in san MH 1 ea <br />9 8 X4 wye 4 ea <br />10 8 x 6 wye 2 ea <br />11 4 in Service pipe 131 ft <br />12 6 in service pipe 78 ft <br />13 Connect to watermain 2 ea <br />14 8 in DIP 938 ft <br />15 Hydrant w/valve - 1 ea <br />16 8 in gate valve 1 ea <br />17 1 in copper service 124 ft <br />18 1 in curb stop w/box 4 ea <br />19 4 in DI service pipe. 116 ft <br />20 4 in valve w/box 2 ea <br />21 DI ftgs 1050 lbs <br />22 Class 5 963 tn <br />23 Bit Base course 526 tn <br />24 Bit Wear course 0 tn <br />25 Conc C&G 2507 ft <br />26 2X3 CB 2 ea <br />27 72 in Stm MH 2 ea <br />28 60 in Stm MH 3 ea <br />29 18 in RCP pipe 450 ft <br />30 24 in RCP pipe 68 ft <br />31 27 in RCP pipe 33 ft <br />32 'Water Quality Treat System 1 Is <br />33 Conc sidewalk 0 sq yd <br />34 Conc ped ramp 0 ea <br />35 Topsoil borrow 0 cu yd <br />36 Sod 0 sq yd <br /> <br />7000.00 <br />1300.00 <br />3.15 <br />3.15 <br />4:00 <br />525.00 <br />14100 <br />2265.00 <br />52.00 <br />63.00 <br />17.60 <br />18.00 <br />520.00 <br />25.85 <br />2825.00 <br />860.00 <br />12.50 <br />lQ0.00 <br />21.00 <br />550.00 <br />1.45 <br />0.10 <br />35.35 <br />35.35 <br />10.20 <br />1525.00 <br />3175.00 <br />24O0.00 <br />30.00 <br />36.00 <br />44.00 <br />41,300.00 <br />33.55 <br />475.00 <br />1.00 <br />3.15 <br /> <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br /> <br /> 5,250.00 <br /> 650.00 <br /> 1';732.50 <br /> 1,764.00 <br />21 ,O2O.O0 <br /> 526,00 <br /> 6,076.00 <br /> 2,265.00 <br /> 2O8:O0 <br /> 126.00 <br /> 2,305.60 <br /> 1;404.00 <br /> 1,040.00 <br />24,247.30 <br /> 2,825.00 <br /> 860.00 <br /> 1,550.0O <br /> 400.00 <br /> 2,436.00 <br /> 1;100.00 <br /> 1,522.5O <br /> 96.30 <br /> 18,594.10 <br /> <br />25,571.4O <br />3,050:00 <br />6,350.00 <br />7,200.00 <br />13,500.00 <br />2,448.00 <br />1,452.0O <br />41,300.00 <br /> <br />'213- <br /> <br /> <br />