Laserfiche WebLink
TAT <br /> <br />E M E N T O F W O R K C E R T_i F I E D <br /> <br />STATE <br /> <br />OF MINNESOTA - DEPARTMENT OF TP_ANSPORTATiON <br />MAIN BODY ITEMS (GrouP'Level Detail) <br /> <br /> Voucher No. 12 Sheet No: 12 <br /> <br />............................................ J ............................................... T ...... ' ..... ~ ............................. <br /> Unit Contract Contract To Date To Da~ Grp Line <br /> <br />Item Contract <br /> <br />Number Item <br /> <br />2506.502 £ONST DRAINAGE STRUCI"07LE DESIGN <br /> <br /> Totals for Proposal Line Number <br /> <br /> Unic Price Quantity Amount Quantity Amount No. No. <br /> <br />F, AC~ 3,750.00 1.00 3,750,00 1.00 3,750.00 002 1060 <br />1060 1..00 $3,750.00 1.00 $3,750.00 <br /> <br /> 2506.516 CASTING ASSEMBLY ~AC~ 470.00 104.00 %8,880.00 115.00 54,050.00 002 1070 <br /> 2506.516 CASTING ASSEMBLY EAC/4 470.08 4.00 1,880.00 4.00 1,880.00 004 1070 <br /> 2506.516 CASTING ASSF24BLY EACH 470.00 10.00 4,700.00 12.00 6,640,00 006 1070 <br /> 2506.516 CASTING ASSEMBLY EAC~ 470.00 13.00 6,110.00 0.00 0.00 007 1070 <br /> <br /> Totals for Proposal Line Number 1070 131.00- $61,570.00 131.00 $61,670.00 <br /> <br /> 2506.522 ADJUST FRJ~ME & RING CASTING EACH 30~.00 ll.0O 3,300.00 !1.00 3,300.00 001 1080 <br /> <br /> Totals for Proposal Line Number 1080 11.00 $3,300.00 11.00 $3,300.00 <br /> <br />2506.602 CONNECT INTO EXISTING MA~q4OLE EAC~ 720.00 2.00 1,440.00 2.00 1,440.00 007 1090' <br /> <br /> Totals for Proposal Line Number 1090 2.00 $1,440.00 2.00 $1,440.00 <br /> <br />2506.602 CONSTRUCT SANITARY MANHOLE EAC~ i,645.73 11.00 i8,i03.03 10~00 16,457.30 007 1!00 <br /> <br /> Totals for Proposal Line Number 1100 11.00 $18,!03.03 10.00 $16,457.30 <br /> <br />2506.603 CONSIT{UCT SANITARY MA_N-HOLES M 268'.87 14.00 3,764.18 10.94 2,941.~3 007 1110 <br /> <br /> TO~lS for Proposal Line Nu~er 1110 14.00 $3,764.18 19.94 $2,941.43 <br /> <br />2506.603 P~ECONSTRUCT SANITARY MANHOLES M 500.00 4.90 2,450.00 8.24 4,120.00 00! 1120 <br /> <br /> Totals for Proposal Line Number 1120 4.90 $2,%50.00 8.24 $4,120.00 <br /> <br />2511.501 P~OM RIPRAP CLASS III M3 73.08 62.10 4,538.26 74.20 5,422.53 002 1130 <br /> <br /> TotaLs for Proposal Line Number 1130 62.~0 $4,S38.26 74.20 $5,422.53 <br /> <br />2521.501 75 MM CONCRETE WALK M2 21.26 4,085.00 $6,847.10 2,874.00 6!,101.24 001 1140 <br /> <br />2521.501 75 MM CONCLRETE WALK M2 2'1.26 39.8.00 8,46~.48 269.00 5,716.94 003 1140. <br /> <br /> Totals for Proposal Line Number 1140 4,483.00 $95,308.58 3,143.00 .$66,820.18 <br /> <br />2~!.~0i 100 ~ Co~cRETE W~L~ M2 22.38' 13~.00 3,1i0.8~ 2~f. 00 4,~S6..46 001 1150' <br /> <br />2521.501 100 MM CONCRETE WA/~K M2 22.38 709.00 15,867.42 2,011.00 45,006.18 005 1150 <br /> <br /> Totals for Proposal Line Number 1150 848.00 $18,978.24 2,228.00 $49,862.64 <br /> <br />2521.501 150 MM CONCRETE WAJ~K M2 29.66 43.00 1,275.38 49.30 1,462.23 001 1160 <br /> <br />2521.501 150 MM CONCP~ETE WALK M2 29.66 12.00 355.92 _- ~ 13.70 406.34 003 1160 <br /> <br /> ToCats for Proposal Line Number 1160 55.00 $1,631.30 63.00 ~1,868.58 <br /> <br />NUMBER 199-010-03 <br /> <br />FOR WORK COMPLETED AS OF 08/26/2003 <br /> <br />Contract Number: Z00516 <br /> <br />-251- <br /> <br /> <br />