Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br /> <br /> Project # 04-WTR-015 <br /> Project Name South Highway 10 Frontage Road <br /> <br />2006 thr2~ 2010 <br /> <br />Contact Unassigned <br />Department Water Utility <br />Type Improvement <br />Useful Life $0 Years <br />Category Water LltjlJtylmprovement <br />Priority n/a <br /> <br />I Description ~ TotalProject Cost 578,000 <br /> <br />IThis project would consist of 1,000 lineal feet ofwatermain and boring under Highway 1~), and a watermain loop <br />Iprovided for residents south of Highway 10. <br /> <br />[Total project costs including land. street, sewer, water and storm sewer = $723,280. <br /> <br />IJustific.a!i.o.n ] ' <br /> <br /> Water improvements that would be required to encourage optimal development and redevelopment within the area. <br /> Additionally,,~, the residents east of Tungsten (as well as the new. dev¢opment) would be ona,dead end line. The looping <br /> of the watermain would benefit these individuals by providing a more continuous flow of water and better fire <br /> protection. <br /> <br />Expenditu res 2006 2007 2008 2009 2010 T°tat <br />Building Cost/Construction 78,000 78,000 <br /> Total 78,000 78,000 <br /> <br />Funding Sources 2006 2007 2008 2009 2010 Total <br /> <br />Water Utility Fund 78,000 78,000 <br /> <br />Total 7~,000 78,000 <br /> <br /> Revised 10/05 <br /> <br />-188- <br /> <br /> <br />