My WebLink
|
Help
|
About
|
Sign Out
Home
01/12/23
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2020's
>
2023
>
01/12/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2023 3:07:28 PM
Creation date
1/6/2023 3:28:31 PM
Metadata
Fields
Template:
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIGURES I MINNEAPOLIS INDUSTRIAL 1 032022 <br /> Absorption,Vacancy, and Construction FIGURE 4:Historic Construction Activity and Percentage of Buildings Pre-Leased <br /> In 03,the Minneapolis industrial market absorbed 2.6 million sq.ft.,bringing the 2022 year-to-date SF(Millions) <br /> total up to 6.2 million sq.ft.The Northwest and East submarkets experienced the strongest positive 9 100% <br /> absorption with 1.1 million sq.ft.and 573,971 sq.ft. respectively.Following such strong activity, <br /> vacancy rates this quarter dropped to 3%,a decrease of 50 basis points year-over-year. 8 90% <br /> There are currently 8.9 million sq.ft.of new industrial development under construction in the 7 80% <br /> Minneapolis market.Of that,69% is speculative development with 37% percent pre-leased.Several <br /> large speculative projects underway include the 1M sq.ft.Cubes at French Lake in Dayton,the 6 70% <br /> Cottage Grove Logistics Park 2,and the I-94 East Logistics Center in Woodbury. <br /> 60% <br /> In 03,there was 2 million sq.ft.of new construction delivered including the 610 Broadway Business 5 <br /> Center in Brooklyn Park,Arbor Lakes Business Park III in Maple Grove, Chaska Creek 1,and the 50% <br /> Nordeast Business Center in Minneapolis. 4 <br /> 40% <br /> FIGURE 2:Current Construction by Submarket FIGURE 3:Speculative and Built-To-Suit Under Construction 3 ° <br /> 30/° <br /> Sq. Ft. <br /> (Millions) 2 I 20% <br /> 9 <br /> 8 1 10% <br /> 6 , 1 1 0 <br /> 5 0 0 0 0 y y y ti ti ti ti <br /> 4 tioti yoti yoti Doti Doti Doti tioti tioti tioti tioti tioti <br /> 3 ati ati a� a° a� ati a� a° ati ati 6 <br /> 2 <br /> 1 <br /> 0 <br /> oo-O 9 0220211 Ql,202° 01?971 0.112021 032022 Under Construction Completed Construction Average%Pre-Leased <br /> i Northwest ■Southwest ■North Central —Speculative ■Bult-to-Suit <br /> South Central ■East <br /> Source:CBRE Research,03 2022. Source:CBRE Research,03 2022. Source:CBRE Research,Q3 2022. <br /> 2 CBRE RESEARCH ©2022 CBRE,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.