My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/17/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 01/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:08 AM
Creation date
1/12/2023 3:59:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Autumn Heights Street Reconstructions (IP #22-02) <br />• Construction complete e punch list mode <br />• 2022 Neighborhood Street Overlay Improvements (IP #22-04) <br />o Construction complete e punch list mode <br />• Riverdale Drive Trunk Utility Improvements (IP #22-05) <br />• Construction complete e punch list mode <br />• Wood Pond Hills 2nd, 3rd, 4th, 5th Street Reconstructions (IP #22-06) <br />o Construction complete e punch list mode <br />• Construction complete e removing from list <br />• Highway 47 Sound Wall north of Xkimo Street (IP #22-17) <br />o City Council will consider authorizing bids on 01/24/23 <br />• WTP Trunk Watermain Improvements (#21-08) <br />• Plans are being revised to minimize project costs and include WTP commissioning improvements <br />(well -house valves, etc.) <br />• City Council will consider authorizing bids when plans are complete <br />• Centralized Water Treatment Plant (#21-09) <br />• AE2S finalizing plans and specs <br />• City Council will consider authorizing bids on 01/24/23 <br />• Ramsey Gateway Highway 10 Improvements (IP #20-11) <br />• Final design nearly complete <br />• Property/easement acquisitions in progress <br />• Construction anticipated 2023 through early 2026 (2024 - 2025 majority) <br />• Riverdale Drive east of SLB & temp US 10 widening Spring/Summer 2023 <br />• Riverdale Drive Extension — Llama Street to Bowers Drive (IP #20-05) <br />• Construction substantially complete e Hwy 10 improvements still needed <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />o City Council will consider authorizing bids on 01/24/23 <br />City of Anoka Improvement Projects <br />• Highway 47 Corridor Improvements <br />• Construction proposed for 2025 <br />• Anoka webpage https://clients.bolton-menk.com/anokahwy47/ <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />o Anoka County received $1.35M in HSIP funds (est. project cost $1.5M) <br />o JPA includes City cost share of $28,667.64 <br />o Construction proposed for 2023 pending final City & County approvals <br />MnDOT Improvement Projects <br />• Anoka Solution Highway 10 Improvements <br />o Final completion Spring 2024 <br />o 2-lanes open for winter <br />o Anoka webpage https://clients.bolton-menk.com/hwy10/ <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />o Final completion Spring 2024 <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwy10-anoka/ <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design suspended to explore s-curve realignment <br />o $45M in bonds authorized October 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.