Laserfiche WebLink
EXHIBIT B <br />Fees Payable to the City <br />1. Park Dedication. The PERMITTEE is responsible for satisfying applicable Park <br />Dedication Fee requirements. PERMITTEE must pay a Park Dedication Fee of <br />$121,500.00 (27 units x $4,500.00 per unit). The PERMITTEE acknowledges that these <br />fees are estimates. The rate in effect when the Plat is recorded will be collected. <br />2. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. PERMITTEE must pay a Trail Development Fee of <br />$40,500.00 (27 units x $1,500.00 per unit). The PERMITTEE acknowledges that these fees <br />are estimates. The rate in effect when the Plat is recorded will be collected. <br />3. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary <br />Sewer Trunk Fee of $36,423.00 (27 units x $1,349.00). The PERMITTEE acknowledges <br />that these fees are estimates. The rate in effect when the Plat is recorded will be collected. <br />4. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable <br />Water Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of $54,243.00 <br />(27 units x $2,009.00 per unit). The PERMITTEE acknowledges that these fees are <br />estimates. The rate in effect when the Plat is recorded will be collected. <br />5. Maintenance Guaranty for Landscape. The PERMITTEE is responsible for satisfying a <br />two-year Landscape Maintenance Guaranty. PERMITTEE shall provide in cash the <br />amount of $10,665.00 [# plantings (81 trees) x cost/planting ($300/tree x 30% average non - <br />survival rate, (150 shrubs) x cost/planting $75/shrub x 30% average non -survival rate]. The <br />PERMITTEE acknowledges that these fees are estimates. The rate in effect when the Plat <br />is recorded will be collected. <br />6. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management <br />Fee of $14,418.00 (27 units x $534.00 per unit). The PERMITTEE acknowledges that <br />these fees are estimates. The rate in effect when the Plat is recorded will be collected. <br />7. Street Sign Fee. While the CITY provides and installs the street name and traffic control <br />signage, the PERMITTEE is responsible for paying for them at a rate of $245.00 per sign. <br />PERMITTEE must pay a Street Sign Fee of $3,430.00 ($245.00 x 4 street name signs; <br />$245.00 x 7 no parking signs; $245.00 x 3 stop signs). <br />8. Development Fees for the Outlots. The PERMITTEE acknowledges that development <br />fees are not being collected for any Outlots. The PERMITTEE acknowledges that <br />development fees will be due upon development of any of the Outlots. The rate in effect <br />at the time said future plat(s) is recorded will be collected. <br />- End of Exhibit B - <br />12 <br />