Laserfiche WebLink
CC Regular Session 5. 16. <br />Meeting Date: 01/10/2023 <br />By: Bruce Westby, Engineering/Public Works <br />Information <br />Title <br />Adopt Resolution #23-017 Approving Proposal from Bolton and Menk, Inc. to Prepare Plans and Specifications <br />for Improvement Project #23-11, Trott Brook Crossing Sanitary Sewer Lift Station <br />Purpose/Background: <br />Purpose: <br />Adopt Resolution #23-017 approving design services proposal from Bolton and Menk, Inc. to prepare <br />Plans and Specifications for Improvement Project #23-11, Trott Brook Crossing Sanitary Sewer Lift <br />Station. <br />Background: <br />On January 11, 2022, the City Council approved the Preliminary Plat for the Trott Brook Crossing residential <br />subdivision. <br />On November 7, 2022, the City Council approved a Grading Agreement for the Trott Brook Crossing residential <br />subdivision, allowing grading activities for the first phase of construction to begin. The developer has since <br />completed mass grading operations for the first phase of the subdivision, consistent with the approved <br />preliminary plat <br />The Developer has not yet applied for Final Plat approval but is anticipated to do so in the near future. <br />Notification: <br />Notifications are not required for this case. <br />Observations/Alternatives: <br />Observations: <br />This is the same process the City followed to design the trunk sanitary sewer lift station improvements that are <br />now serving the Riverstone South residential subdivision. In addition, Bolton and Menk was the design engineer <br />for the Riverstone South lift station improvements. This process worked well, and Staff recommends using the <br />same design engineer for the Trott Book Crossing lift station due to Bolton and Menk's familiarity with the City's <br />design standards and sanitary sewer system, and since most of the lift station design will be similar to the <br />Riverstone South lift station, allowing Bolton and Menk to efficiently and cost-effectively prepare plans and <br />specifications. <br />Approving the attached design services proposal will allow the City to serve the Trott Brook Crossings residential <br />subdivision with the necessary municipal trunk sanitary sewer in 2023 as required to meet the proposed <br />development schedule. <br />Alternatives: <br />Alternative 1: Adopt Resolution #23-017 approving design services proposal from Bolton and Menk, Inc. <br />to prepare Plans and Specifications for Improvement Project #23-11, Trott Brook Crossing Sanitary <br />Sewer Lift Station. <br />Funding Source: <br />