My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/10/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 01/10/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 5:41:05 PM
Creation date
1/13/2023 12:29:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/10/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bruce Westby, P.E. <br />November 11, 2022 <br />Page 4 <br />• Maintenance pad, <br />• Electrical and controls, and <br />• Other site improvements. <br />Stormwater Pollution Prevention Plan (SWPPP) <br />Our team will design a stormwater management plan that adequately manages the runoff from <br />and through the project area. <br />Plans will be prepared and included in the plan set, as well as submitted to the permitting <br />agencies upon completion of this effort. <br />Final Cost Estimate <br />An updated engineer's cost estimate will be prepared upon completion of final design. <br />NPDES/SDS Permit Application <br />We do not anticipate the project will disturb more than one acre of land. No fees were included in our <br />proposal for this effort. <br />Lower Rum River Watershed Management Organization Application and Related Activities <br />We anticipate that a grading permit will be required from the Lower Rum River Watershed Management <br />Organization. The $800 permit application fees will be invoiced to the City with no mark up from Bolton <br />& Menk. <br />Storm water modeling will be extremely limited for the project. Based on the final configuration of the <br />concrete pad(s) at the lift station site, the new impervious area will likely be between 400 and 600 square <br />feet. We are assuming this will be directed towards a pond located south of the site. We will work with <br />the City to describe the minimal impacts in the permit application. <br />No wetlands are anticipated along the corridor. We will provide a cursory wetland review to ensure that <br />any excavations occur outside of wetland limits. <br />MPCA/MCES <br />Our understanding is the MPCA or the MCES require permit applications when lift stations are added to <br />the sanitary sewer system. We have included fees for preparation of the necessary permits. <br />Task 5: Bidding Phase Services <br />Coordinate Solicitation of Bids <br />We will prepare and submit the Advertisements for Bid for the appropriate publications and upload the <br />bidding documents onto Quest CDN. <br />Pre -Bid Conference <br />None anticipated. <br />Bidding Questions <br />We will be available throughout the Bidding Phase of the project to answer questions from potential <br />Bidders as they arise. <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.