Laserfiche WebLink
CASE <br /> <br />APPROVE CONTRACT FOR RAMSEY TOWN CENTER CITY PHASE II, <br />SEGEMENT II & III IMPROVEMENT DESIGN <br /> By: Leonard Lintou, Civil Engineer II <br /> <br />Background: <br /> <br /> The Ramsey Town Center project includes developer constructed streets and City <br /> constructed streets. The projects were broken up into phases, corresponding to <br /> anticipated growth patterns so that street construction would correspond with the adjacent <br /> lot developments. The feasibility reports for the City Phase I and City Phase II portions <br /> of the project were received at the February 8, 2005 City Council Meeting and the Public <br /> Hearing was held at the February 22, 2005 meeting. The design and construction of each <br />· phase was contingent on the development roaching certain milestones and receiving a <br /> request from Ramsey Town Center, LLC for each phase. The City Phase I improvements <br /> were ordered and constructed in 2004 which comprised Sunwood Drive and Rhinestone <br /> Street (including bridge). The City Phase II, Segment I improvements were approved <br /> and constructed in 2005. These improvements are Zeolite Street, Civic Center Drive and <br /> Sapphire Street which provide access to the south side of the New City Hall and Parking <br /> Ramp. <br /> <br />The City has received letters from Ramsey Town Center, LLC 'requesting preparation of <br />plans and specifications for the following Improvements (map attached): <br /> <br />· Zeolite Street NW from Sunwood Drive to Bunker Lake Boulevard <br />· Zeolite Street Bridge Between West Ramsey Parkway North and West <br /> Ramsey Parkway South <br />· Civic Center Drive for Sapphire Street NW to Rhinestone Street NW <br />· Rhinestone Street from Civic Center Drive to Sunwood Drive <br /> <br />Staffhas requested a proposal from Hakanson Anderson Associates, Inc. for design and <br />engineering services on these projects. They prepared the feasibility study for these <br />improvements. <br /> <br />The proposal is itemized into the following major work steps and proposed fees: <br /> <br />Phase Project Segment Design Cost <br /> <br />II <br /> <br />II <br />III <br /> <br />III <br /> <br />Zeolite Street from Sunwood Drive <br />to Bunker Lake Boulevard <br />Zeolite Street Bridge <br />Civic Center Drive from Saphhire <br />Street to Rhinestone Street <br />Rhinestone Street from Civic <br /> <br /> Engineering Costs <br /> During <br />· Construction <br /> <br />$39,500.00 $19,975.00 <br />$87,872.00 $98,802.00 <br /> <br />$19,900.00 $9,875.00 <br />$4,900.00 $5,650.00 <br /> <br />-287- <br /> <br /> <br />