My WebLink
|
Help
|
About
|
Sign Out
Home
02/09/23
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2020's
>
2023
>
02/09/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2024 9:12:14 AM
Creation date
2/3/2023 4:32:53 PM
Metadata
Fields
Template:
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />February 2, 2023 <br />Bruce Westby <br />City Engineer / Public Works Director <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />Re: Feasibility Report Update- City of Ramsey Improvement Project #18-02 <br />West Armstrong Area Ramsey Street Reconstruction <br />Dear Mr. Westby, <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />Transmitted herewith is an Updated Feasibility Report for the proposed West Armstrong Area <br />Reconstruction, previously titled: "HY-10." The project includes 146th Avenue from Ferret Street <br />to its termini cul-de-sac, 147th Avenue from Ferret Street to 380 feet west of Armstrong <br />Boulevard, and Ferret Street from 146th Avenue to Bunker Lake Boulevard. The report examines <br />the feasibility of reconstructing the bituminous street section and completing other appurtenant <br />improvements. <br />This Feasibility Report examines the scope of the proposed improvements, explores estimated <br />costs and available funding sources, defines a preliminary project schedule, and determines the <br />necessity, feasibility, and general cost-effectiveness of the proposed improvements, including <br />any alternate designs, as well as whether the improvements would best be completed separately <br />or in conjunction with another project. <br />I would be happy to discuss this report with you at your convenience. Please feel free to contact me <br />at 651-968-7760 or kevin.kielb(&,bolton-menk.com with any questions. <br />Sincerely, <br />Bolton & Menk, Inc. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.