My WebLink
|
Help
|
About
|
Sign Out
Home
02/09/23
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2020's
>
2023
>
02/09/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2024 9:12:14 AM
Creation date
2/3/2023 4:32:53 PM
Metadata
Fields
Template:
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. CONCLUSIONS AND RECOMMENDATIONS <br />City of Ramsey Improvement Project No. 18-02 proposes to reconstruct the bituminous pavement <br />section, to remove the existing bituminous curb and replace it with a combination of B618 <br />concrete curb and gutter and bituminous curb, and to complete miscellaneous appurtenant work <br />on the following street segments within the West Armstrong Area commercial subdivision: <br />1. 146th Avenue (approx. 230 linear feet) —Ferret Street to bulb of east cul-de-sac. <br />2. 147th Avenue (approx. 190 linear feet) —Ferret Street to 180 feet west of Armstrong <br />Boulevard. <br />3. Ferret Street (approx. 1500 linear feet) — 146th Avenue to Bunker Lake Boulevard <br />It is the recommendation of City staff that City Project No. 18-02 is feasible, necessary, and cost- <br />effective from an engineering standpoint, and this project would best be constructed as a stand- <br />alone project as proposed herein. <br />Feasibility Report Update <br />West Armstrong Area Street Reconstruction <br />City of Ramsey Project No. 18-02 <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.