Laserfiche WebLink
TRAFFIC & PARKING IMPACT LETTER - DRAFT <br />ANOKA RAMSEY ATHLETI C ASSOCIATION DOME <br />TABLE OF FIGURES <br />Figure 1: Historical AADT within th City of Ramsey's The COR............................................................................................................3 <br />Figure 2: Locations within The COR historical AADT volumes analyzed to determined annualized average growth. From the City <br />ofRamsey, 2022...................................................................................................................................................................................4 <br />Figure 3 Highway Capacity Manual (HCM), 2016 Signalized Intersection LOS................................................................................7 <br />Figure 4 Highway Capacity Manual (HCM), 2016 Unsignalized Intersection LOS.............................................................................7 <br />TABLE OF TABLES <br />Table 1: Existing ITE Trip Generation along Ferret Street Northwest.................................................................................................5 <br />Table 2: Summary of 2022 Existing ITE Trip Generation....................................................................................................................5 <br />Table 3: Intersections 1 and 2 Existing (2022), Opening (2024), Full Build (2027), Future (2034) LOS, Delay, and Utilization. <br />................................................................................................................................................................................................................ 6 <br />Table 4 Trip Generation of the Proposed Facility in 2024 Opening Condition..................................................................................8 <br />Table 5: Trip Generation of the Proposed Facilities in 2027 Full Build Condition............................................................................9 <br />Table 6: Intersection 1, 27 3, and 4 Opening (2024, Full Build (2027), Future (2034) LOS, Delay, and Utilization .................... 10 <br />Table 7: Maximum parking needs of ARAA for youth sports............................................................................................................ 13 <br />Table 8: Average parking needs of ARAA for youth sports............................................................................................................... 13 <br />Table 9: Maximum parking needs of ARAA for high school level sports......................................................................................... 14 <br />Table 10: Average parking needs of ARAA for high school level sports.......................................................................................... 14 <br />Architecture + Engineering + Environmental + Planning Page iv <br />