My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/14/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 02/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 10:59:01 AM
Creation date
2/14/2023 9:47:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/14/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
392
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAFFIC & PARKING IMPACT LETTER - DRAFT <br />ANOKA RAMSEY ATHLETI C ASSOCIATION DOME <br />The historical AADT volumes were analyzed per location for annualized growth trends with the overall average <br />growth rate of 11% over the past five (5) years throughout The COR. The proposed development is planned to <br />impact the roadway network of Intersections 1 and 2 of this study. An overall analyzed growth of 11% is unlikely <br />sustainable in the vicinity of the proposed development due to the amount of developable area. The locations of <br />E, F, and K were selected to evaluate growth adjacent to of the proposed development. Locations E, F, and K <br />correspond to the following locations: <br />• Location E - the northern approach of Intersection 1. <br />• Location F - the southern approach of Intersection 1. <br />• Location K - the eastern approach of Intersection 1. <br />Figure 2: Locations within The COR historical AADT volumes analyzed to determined annualized average growth. From the City of Ramsey, 2022. <br />The three locations were assessed and determined to have an average annualized growth rate of 7%. This growth <br />rate may occur within the future years and will likely decrease once the surrounding area is developed. The 7% <br />annualized growth rate was utilized for this study and applied to the background traffic in all conditions and <br />scenarios. Scenarios that are provided within this report are the following: <br />• Existing 2022 1 Utilized as a base model to evaluate current conditions for comparison. <br />• Opening 2024 Characterized by the anticipated completion of the ARAA facility and supporting <br />infrastructure. <br />• Full Build 2027 1 Characterized by the anticipated opening of the onsite clinic and restaurant adjacent <br />to the ARAA facility. <br />• Future 2034 1 Provided 10-years after facility opening. <br />Architecture + Engineering + Environmental + Planning Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.