My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/02/2006
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2006
>
Agenda - Planning Commission - 02/02/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:39:00 AM
Creation date
1/27/2006 1:17:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/02/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Calculations: any that were made for the design of such items as sediment <br /> basins, wet detention basins, diversions, waterways, infiltration zones and <br /> other applicable practices. <br /> <br />9.27.09 General Storm Water Pollution Control Plan Criteria. <br /> <br /> Subdivision 1. The plan shall address the following: <br /> <br /> A. Stabilizing ali exposed soils and soil stockpiles and the related time frame or <br /> schedule. <br /> <br /> B. Establishing permanent vegetation and the related time frame or schedule. <br /> <br /> C. Preventing sediment damage to adjacent properties and other designated <br /> areas such as streams, wetlands, lakes and unique vegetation (e.g., oak <br /> groves, rare and endangered species habitats.) <br /> <br /> D. Scheduling for erosion and sediment control practices. <br /> <br /> E. Where permanent and temporary sedimentation basins will be located. <br /> <br /> F. Engineering the construction and stabilization of steep slopes. <br /> <br /> G. Measures for controlling the quality and quantity of storm water leaving a <br /> site. <br /> <br /> H. Stabilizing all waterways and outlets. <br /> <br /> I. Protecting storm sewers from the entrance of sediment. <br /> <br /> J. What precautions will be taken to contain sediment when working in or <br /> crossing water bodies. <br /> <br /> K. Restabilizing utility construction areas as soon as possible. <br /> <br /> L. Protecting paved roads from sediment and mud brought in from access <br /> routes. <br /> <br /> M. Disposing of temporary erosion and sediment control measures. <br /> <br /> N. How the temporary and permanent erosion and sediment control practices <br /> will be maintained. <br /> <br /> O. How collected sediment and floating debris will be disposed of. <br /> <br />Draft StormWater Ordinance <br /> <br />Page 8 of 20 <br />January 20, 2006 93 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.