My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 02/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:22 AM
Creation date
2/16/2023 4:32:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name and/or Number: Ramsey COR Wetland Analysis <br />Attachment B <br />Supporting Information for Applications Involving Exemptions, No Loss <br />Determinations, and Activities Not Requiring Mitigation <br />Complete this part if you maintain that the identified aquatic resource impacts in Part Four do not require wetland <br />replacement/compensatory mitigation OR if you are seeking verification that the proposed water resource impacts are either <br />exempt from replacement or are not under CWA/WCA jurisdiction. <br />Identify the specific exemption or no -loss provision for which you believe your project or site qualifies: <br />8420.00105 Subpart 2.D — Incidental Wetlands <br />Provide a detailed explanation of how your project or site qualifies for the above. Be specific and provide and refer to attachments <br />and exhibits that support your contention. Applicants should refer to rules (e.g. WCA rules), guidance documents (e.g. BWSR <br />guidance, Corps guidance letters/public notices), and permit conditions (e.g. Corps General Permit conditions) to determine the <br />necessary information to support the application. Applicants are strongly encouraged to contact the WCA LGU and Corps Project <br />Manager prior to submitting an application if they are unsure of what type of information to provide: <br />8420.00105 Subpart 2.D — Incidental Wetlands <br />Figure 1 shows historical imagery of the proposed incidental wetlands. Wetlands 3, 5, and 6, and portions of Wetland 2 <br />and 7 are being requested as incidental wetlands. <br />Wetlands 3, 5 and 6, and portions of Wetlands 2 and 7 are ponds excavated in upland and were not constructed with the <br />intent of creating a wetland. These wetlands were observed to have distinct slopes and were excavated to be significantly <br />lower than the surrounding area. Wetland 3 was constructed in 2011. Wetlands 5 and 6 were constructed in 2012. <br />Wetland 2 was excavated between 1997 and 2000. Wetland 7 was excavated between 2005-2006. <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.