My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 02/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:22 AM
Creation date
2/16/2023 4:32:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mun cipal <br />Plaza <br />maintenance <br />access (12') <br />plaza <br />pavement <br />stormwater �^• <br />catchment <br />planter <br />solar <br />canopy ' <br />Regional <br />Trail <br />Center <br />Street <br />solar <br />canopy 1000000000000 <br />a luu <br />1000000000000 <br />1000000000000 000000000 <br />uuuuuuuuuVllll <br />tat*1111111111111111111111111111111111111111111111 <br />1111111111111111111111111111111111111111111111111 <br />uuuuumomlouuuIIiiIIImImIIIII�IIII <br />111111111111111111111111111111111111111111 <br />IIIIIIIIIIIIIIIIIII <br />111111111111111111111111111111111111111uuuuumu <br />kllllll lull6d�llll l' <br />lawn ' <br />HHHE <br />l1111 <br />ilililililiill Id <br />uumu <br />IIiIIIIIIIVudWIVWW.V. oluuuuuuuuuu11ll� Ili!IIII� <br />Center Street <br />access driveway <br />IIV <br />H1 <br />I�Nfpi I <br />11pllllpullllu04 <br />. <br />m.I I�w <br />1111111111111111111111 <br />VMuiiiimil°6u �V p'iryl q <br />it or <br />.1¶ H AVw''D,',N Pq'. <br />Pump House Plaza <br />PROJECT DESCRIPTION <br />Catc ent <br />Basin <br />MM,W�,M�MAH,HAN <br />The Conceptual Site Plan for Pump House Plaza includes the following elements: <br />• Paved plaza/sitting area along east facade of the Pump House Building; <br />• Solar canopy/shade structure over the plaza/sitting area; <br />• Paved (10' minimum width) north/south pedestrian walkway; <br />• Stormwater catchment basin/planters between pedestrian walk and Center Street; <br />• Small open lawn/flex space for information/crafts/food tent and other uses; <br />• Variety of landscape plantings to provide shade, color, screening. <br />Note: the sequence of project design and construction will begin with Pump House <br />Building facade improvements, followed by Pump House Plaza site and landscape <br />improvements, and then additional project feasibility evaluation and detailed design <br />related to the Rest Room + Maintenance Building. <br />ET AREA FRAMEWORK + POLICY PLAN <br />10' Wide <br />Concrete <br />Walk <br />III I I�� RI,) IIIIIIIIIIIIIIIII III�Itu11 OR <br />I,) <br />Plaza Sitting <br />Area <br />w/Canopy <br />Municipal <br />Pump <br />House #3 <br />The primary objective is to create a series <br />of smaller, pedestrian -scaled public spaces <br />along the east side of Center Street to <br />complement and enhance Municipal Plaza, <br />especially for various events that include <br />the temporary closure of the street. All three <br />of these major elements (Municipal Plaza, <br />Center Street, east frontage public spaces) <br />will seamlessly fit together, including <br />consistent materials, finishes and <br />furnishings to create a unique identity and <br />inviting destination crossroads in the heart <br />of the COR District. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.