Laserfiche WebLink
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br />i m allItiV"m <br />1111111111111111111111111 <br />111 <br />�IP;Ihli�l��i;� <br />ulp�d"�W <br />Parallel parking <br />bay (both sides) <br />Stormwater <br />catchment <br />basins <br />1$I0tiria4 cr, <br />Center Street <br />Concept Plan <br />50 <br />1 <br />III�I <br />Replace existing <br />match n,ew curb <br />ardl gutter, storm- <br />wliter catchment <br />basins and other <br />proposed improve- <br />ments in this area. <br />Keep existing curb/ <br />gutter, concrete <br />walk/Regional Trail <br />and street pave- <br />ment in this area. <br />Parallel <br />Parking Bay (both <br />sides) <br />u <br />IIIII uiiu iuli'uu' I I II uiiu uuu uuu uuu uuu uuu uuu uuu uuu uuu uuu iuli'uuii uiiu iuli'uuii uiiu iuli'uuii uiiu uuu uuu uuu uuu uuu uuu uuu <br />�Vlmmuuolilillmliliploulilupliluuolilillmmuomilupliluuolilillmliliploulilupllnnlmmminm�mmmmminmmmmmmn!ipmminlnmiomll I Qom I � Im I � lul I � Mmmminmm�mmmmmmmnlnmommlmaul I � mIM�MIM�MIM� q mlI � Im I �Im q mlI � Im I �Im q mlI � Im I �Im q Im I � lul I � lul I � Im I � lul I � lul I � Im I � lul I � lul I � mlI � Im I �Im q mlI � Im I �Im q mlI � ISM <br />nyuli�'I'I�Id"!���1�°III lll°IIl��lgl� <br />Regional <br />Trail <br />Stormwater Catchment <br />Basin (both sides) <br />Center Street <br />PROJECT DESCRIPTION <br />The primary purpose of the Conceptual Site Plan for Center Street is to illustrate how this key <br />north/south connector ties together all the other pieces of this Framework + Policy Plan. <br />At the same time, it also promotes various opportunities for innovative district infrastructure <br />as an integral part of current and proposed street, park, trail and private development <br />project design - suggesting shared systems for stormwater capture/reuse, energy <br />production/distribution, waste handling/recycling and other technologies. <br />It's important to note however, that this <br />document also presents a somewhat <br />cautious approach, seeking to minimize <br />disruption to existing Center Street im- <br />provements. The basic objective is to work <br />with existing curb lines, parking bays and <br />other pavement dimensions as the starting <br />point for completing street construction to <br />Ramsey Parkway and northward to Bunker <br />Lake Boulevard. (Also refer to the Sapphire <br />Apartments Frontage and Central Anoka <br />County Regional Trail information in this Plan) <br />23 <br />