Laserfiche WebLink
ESTIMATED CONTRUCTION TOTAL: <br />PRELIMINARY ENGINEERS ESTIMATE <br />10% CONSTRUCTION CONTINGENCY: <br />TOTAL ESTIMATED CONSTRUCTION COST: <br />Z <br />INCLUDES TOPSOIL STRIPPING AND STOCKPILING <br />STOCKPILE LOCATION: PUBLIC WORKS, 14199 JASPER STREET NW. CONTRACTOR SHALL USE ALL AVAILABLE STOCKPILE MATERIAL BEFORE IMPORTING AGGREGATE <br />CHIMNEY SEAL <br />