My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 02/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:22 AM
Creation date
2/16/2023 4:32:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3 Water Main Improvements <br />Watermain is proposed to be extended on Ferret Street from Bunker Lake Boulevard to <br />146th Street. Watermain is also proposed to be extended from mid -block 147th Avenue to <br />Ferret Street. Adding this segment on 147th Avenue will loop together the watermain in <br />this area and provide service for future development. <br />4.4 Sanitary Sewer Improvements <br />Sanitary Sewer is proposed to be extended on Ferret Street from Bunker Lake Boulevard <br />to 146th Avenue NW. Adding this segment on Ferret Street will provide service for future <br />development. <br />4.6 Private Utilities <br />Staff has not yet met with the telephone, gas, power and cable utilities regarding this <br />project. During preparation of plans and specifications, Staff will meet with the private <br />utility companies to discuss the proposed improvements as noted in the project schedule <br />within this report. The alignment and footprint of the streets will be considered to <br />minimize impacts to private utilities. Impacts to private utilities area anticipated with this <br />proj ect. <br />Should any utility company indicate they wish to upgrade, replace and/or otherwise <br />modify their services during this project, any such upgrades, replacements and/or <br />modifications will be at the sole discretion and cost of the utility company. <br />4.7 Traffic Analysis <br />Based upon the potential traffic changes associated with the redevelopment of the HY-10 <br />area, more comprehensive traffic analyses are recommended to be completed at the <br />following locations: <br />• Bunker Lake Boulevard/Armstrong Boulevard, <br />• Bunker Lake Boulevard/Ferret Street, and <br />• Armstrong Boulevard/147th Street. <br />Initially, a Bunker Lake Boulevard westbound left turn lane and Ferret Street northbound <br />designated left turn lane and right turn lanes are all warranted. The current land use zoned <br />"COR" allows for flexibility. If the HY-10 Area evolves to more commercial orientated <br />uses with the addition of the ARAA facility and others, additional analysis is warranted to <br />better understand the impacts. A detailed traffic analysis memorandum is included in <br />Appendix D. <br />4.8 Permits <br />Permits that are anticipated to be required as part of the proposed improvements include: <br />• Minnesota Pollution Control Agency (MPCA): Sanitary Sewer Extension <br />• Minnesota Department of Health (MDH): Watermain Extension <br />• MPCA General Stormwater Permit: Grading and Storm Water <br />• Lower Rum River Watershed Management Organization (LRRWMO) Grading <br />and Storm Water <br />Feasibility Report Update <br />HI -10 Ramsey Improvements <br />City of Ramsey Project No. 18-02 <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.