Laserfiche WebLink
• Construction complete e punch list mode <br />• Highway 47 Sound Wall north of Xkimo Street (IP #22-17) <br />o City Council will consider authorizing bids soon (March/April) <br />• WTP Trunk Watermain Improvements (#21-08) <br />• Plans are being revised to minimize project costs and include WTP commissioning improvements <br />(well -house valves, etc.) <br />• City Council will consider authorizing bids when plans are complete <br />• Centralized Water Treatment Plant (#21-09) <br />• Bid opening March 9th (r 1 PM <br />• City Council to consider accepting bids and awarding contract March 28th <br />• Ramsey Gateway Highway 10 Improvements (IP #20-11) <br />• Final design nearly complete <br />• Property/easement acquisitions nearly complete <br />• Construction anticipated mid 2023 through early 2026 (2024 - 2025 majority) <br />• Riverdale Drive east of SLB & temp US 10 widening mid 2023 <br />• Riverdale Drive Extension — Llama Street to Bowers Drive (IP #20-05) <br />• Construction substantially complete e Hwy 10 improvements still needed <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />o Executing contract <br />o Awaiting DNR Permit <br />City of Anoka Improvement Proiects <br />. Highway 47 Corridor Improvements <br />• Construction proposed for 2025 <br />• Anoka webpage https://clients.bolton-menk.com/anokahwv47/ <br />Anoka County Improvement Proiects <br />. Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive (IP #23-03) <br />oAnoka County received $1.35M in HSIP funds (est. project cost $1.5M) <br />o JPA includes City cost share of $28,667.64 <br />o Bids opened February 13th (results as yet unknown) <br />MnDOT Improvement Projects <br />• Anoka Solution Highway 10 Improvements <br />o Final completion Spring 2024 <br />o 2-lanes open for winter <br />o Anoka webpage https ://clients. bolton-menk.com/hwv10/ <br />o MnDOT webpage http://www.dot.state.mn.us/metro/protects/hwv10-anoka/ <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />o Final completion Spring 2024 <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv10-anoka/ <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design suspended to explore s-curve realignment <br />o $45M in bonds authorized October 2020 <br />o Construction proposed for 2024 or later <br />o MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv47rr-anoka/ <br />• Rum River Bridge Replacement <br />• Final completion Spring 2024 <br />• Three lanes each direction <br />• MnDOT webpage http://www.dot.state.mn.us/metro/projects/hwv10-anoka/ <br />Studies & Items of Interest <br />