Mr. Bruce Wcstby, P.E. <br />September 26, 2022 <br />Page 2 of 3 <br />• Clear and grub the area of The COR bounded by Sunwood Drive, Bunker Lake Boulevard, <br />Armstrong Boulevard and Center Street, <br />• Strip off topsoil for the above area and stockpile the material, <br />• Dewater the area to allow for deep excavations to occur, <br />• Excavate the pond, placing the material in locations identified within The COR, <br />• Place a 2 ft thick clay liner in the pond from the bottom up to the normal water level, <br />• Fine grade the area of the regional stormwater retention pond, and <br />• Revegetate all areas disturbed by construction. <br />We will provide construction cost estimates associated with the improvements. <br />SCOPE OF SIEIRr�'IIICIES <br />Our anticipated scope of services will be as follows: <br />• Complete a drone flight of the area to provide a current aerial image of the area. The drone <br />flight will provide a level of accuracy of 0.1 ft horizontal and 0.3 ft vertical. This will allow for <br />accurate estimations of excavations and fill volumes required to construct the Waterfront and <br />move the material to adjacent lots within The COR area. <br />• Update the stormwater model to analyze elevations within the Waterfront and impacts <br />associated with filling existing stormwater ponds across The COR. <br />• Analyze the potential for filling the wetland that was created in the southeast quadrant of <br />Bunker Lake Boulevard and Armstrong Boulevard. This will be completed under a separate <br />contract and the results will be discussed in the updated report. <br />• Analyze previous report assumptions and update proposed horizontal and vertical elevations <br />associated with the roadways and public utilities within The COR area. Develop current <br />construction cost estimates based on the analysis. <br />• Prepare a report detailing the findings of our analyses. This will likely be in the form of an <br />update to previously prepared reports. <br />No geotechnical analysis will be performed for the project, although previous soil borings completed for <br />the area will be reviewed. <br />SUMMARY OF FEES <br />We have prepared preliminary fee estimates based on our understanding of the work to be performed. <br />We estimate fees will be as presented below: <br />Task Fees <br />Drone Flight $ 2,880.00 <br />Stormwater Analysis $ 7,200.00 <br />Roadway and Public Utility Analysis $ 9,680.00 <br />Report preparation, Including Figures $ 4,420.00 <br />Not -To -Exceed Fees $24,180.00 <br />The fees in the above table represent not -to -exceed costs based on the scope present above. <br />ul rA .nk <br />rr I y <br />