My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 02/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:22 AM
Creation date
2/16/2023 4:32:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
at the work session, and based upon a consensus to proceed, more 'proof -of -concept' and preliminary cost <br />estimates will be developed for subsequent Council consideration. <br />COR and Wetland Study Update <br />Bolton and Menk is nearing completion of the Wetland delineations and approval of those delineations by the <br />WMO and COR infrastructure/site preparation studies. These studies will set the baseline information for <br />options and cost relating to the installation of remaining infrastructure in the COR, These studies will also <br />include information that will assist in development of The Waterfront park, the potential filling of wetlands <br />for site preparation for Parcel 46 and other parcels in the COR. Staff anticipates that the findings of these <br />studies will be presented in a future work session in January or February. <br />Timeframe: <br />Background and planning on The Waterfront's proposed community building: 10-15 minutes <br />Discussion and inquiries on the park's planning process and timeline: 5 minutes <br />Status of The COR — Public Infrastructure Analysis: <5 minutes <br />Total Timeframe: 20 minutes <br />Funding Source: <br />Park planning work is being performed by staff and consultants funded by the 2022 General Fund parks <br />operating budget. <br />The COR — Public Infrastructure Analysis is being performed by consultants and funded by TIF District 14 <br />and/or District 2. <br />Responsible Party(ies): <br />Mark Riverblood will provide a very brief introduction and background on The Waterfront project, and <br />architect Greg Houck will present preliminary design of the proposed park building, together with a <br />description of its utility and feasibility. <br />Sean Sullivan will be available to address the wetland delineation/mitigation process (an element of the <br />attached COR — Public Infrastructure Analysis and Wetland Delineation scope of work) and site preparation <br />work required for Parcel #46 and other lands in the COR, if needed. <br />Bruce Westby will be available to address the status and next steps of The COR — Public Infrastructure <br />Analysis, if needed. <br />Outcome: <br />This work session case is a brief report to Council on the potential of a community building and associated <br />park elements proposed for The Waterfront. (A more in depth discussion on the park and The COR — Public <br />Infrastructure Analysis is anticipated early in 2023.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.