Case #3: Update on Year 2000 Construction Projects <br /> <br />City Engineer Jankowski reviewed the status of the 2000 projects. He stated that the Storm <br />Sewer Improvement 2000 project includes two separate storm water projects at this time: the <br />Juniper Ridge Drive project and the 164th Avenue storm sewer project. The need for an <br />additional storm project should be considered to best coordinate with the 2000 Street <br />Maintenance Program. The Flintwood subdivision is scheduled for bituminous overlay. <br />However, the drainage is very poor at the intersection at 142''a Avenue and Fluorine and Iodine <br />Streets. Unless these intersections are storm sewered, it might be anticipated that the overlay <br />would have a relatively short life. Staff proposed a storm sewer project consisting of installing <br />storm sewer for this area prior to the overlay. The cost is estimated to be $72,500 and would be <br />funded through the storm water utility. <br /> <br />Director of Public Works Kapler stated that the area is in very bad need of an overlay and he <br />feels it would be appropriate to correct the drainage problem at this time. <br /> <br />Councihnember Zimmerman inquired if there is a policy relating to drainage problems in <br />neighborhoods as to where the water goes and who will pay for it. <br /> <br />City Engineer Jankowski explained that the storm sewer itself would be paid by the storm water <br />utility fee, but some of the residents would be assessed for the overlay. <br /> <br />Consensus of the Committee was to recommend to the City Council adding the Flintwood storm <br />sewer project to the 2000 storm drainage utility projects. <br /> <br />The Public Works Committee discussed at length the issue of constructing a bridge across the <br />wetland area when expanding Sunwood Drive. <br /> <br />Consensus of the Committee was to direct staff to hire Hakanson Anderson to discuss the <br />possibility of installing culverts in the area rather than a bridge. <br /> <br />Case #5: T.H. #47 STP Project Update (Improvement Project #98-14) <br /> <br />City Engineer Jankowski stated that monies for the remaining properties required for the project <br />will be deposited on February 16, 2000, and the Right of Way No. 1 Certificate will be <br />transmitted to MnDOT. <br /> <br />Case #6: Public Works Additional Property Acquisition <br /> <br />Director of Public Works/Fire Chief Kapler stated that appraisals of the property should be <br />coming back this week, but noted he received a call from the spokesman for the owner of the <br />property who indicated they have found someone to lease the property for five-years. Mr. Kapler <br />emphasized that it is still a piece of property that has a lot of value to Public Works. <br /> <br />Public Works Committee/February 15, 2000 <br /> Page 8 of 9 <br /> <br /> <br />