My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/28/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 02/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:00:02 AM
Creation date
2/23/2023 3:24:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5.7. <br />Meeting Date: 02/28/2023 <br />By: Bruce Westby, Engineering/Public Works <br />Information <br />Title <br />Adopt Resolution #23-047 Approving Addendum to Geotechnical Report for Improvement Project #23-05, <br />Barthel's Rum River Acres 2nd Addition Street Reconstructions <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23-047 approving addendum to Geotechnical Report for <br />Improvement Project #23-05, Barthel's Rum River Acres 2nd Addition Street Reconstructions. <br />Background: <br />Geotechnical Reports inform Staff of subsoil conditions, which is essential when designing the pavement section <br />for the reconstructed streets. Also included are groundwater elevations and support capabilities of the soils for <br />utilities and trenches, as well as associated backfilling recommendations. <br />On August 23, 2022, the City Council awarded a contract to Haugo Geotechnical Services in the amount of <br />$9,235.00 to prepare a geotechnical report for Improvement Project #23-05, Barthel's Rum River Acres 2nd <br />Addition Street Reconstructions, including 13 soil borings and pavement cores. <br />On December 13, 2022, the City Council ordered the City Engineer to prepare plans and specifications for said <br />improvements. While preparing plans and specifications the City Engineer determined that 12 additional soil <br />borings and pavement cores would be needed to accurately evaluate pavement, subgrade soil and groundwater <br />conditions throughout the project area to ensure that the plans addressed necessary subgrade corrections. A quote <br />was secured from Haugo Geotechnical Services in the amount of $7,640.00 to collect 12 additional soil borings <br />and pavement cores and to prepare an addendum to the previously completed geotechnical report. <br />Haugo Geotechnical Services anticipates completing this work by the end of the first week of March, which will <br />allow Staff to complete design work for said improvements in time to advertise bids in late March. <br />The attached quote includes the following additional services fees. Staff will work with Haugo to avoid such fees <br />as much as practical. If such fees are necessary they will be paid as indirect project costs. <br />• Structurally unfavorable soil conditions including but not limited to loose fill and/or organic materials <br />could be encountered in the soil borings and extend beyond the anticipated test depths. Additional drilling <br />to extend the soil borings will be invoiced at $20 per lineal feet of drilling. <br />• If deeper borings are required the borings may need to be sealed in accordance with Minnesota Department <br />of Health requirements. We will charge $4 per lineal foot to seal the borings, if required. <br />• Snow Removal, if required, will be invoiced at $175 per hour. <br />• In the event that the site is not ready when our crew arrives, we will charge $250 per hour of stand-by time. <br />• If any private utilities are present on site, we expect you to locate them in advance or notify us and we will <br />have located at an additional cost. <br />Notification: <br />Notifications are not required for this case. <br />Funding Source: <br />
The URL can be used to link to this page
Your browser does not support the video tag.