Laserfiche WebLink
HY-10 Ramsey Improvements <br />City of Ramsey <br />Proposed Improvements - Option 1 BOLTON <br />February 2023 & M E N K <br />ESTIMATED COSTS: <br />_ CONSTRUCTION = $1,862,073.40 <br />PROPERTY ACQUISITION = $510,573.62 <br />TOTAL = $2,372,647.02 <br />i•o <br />I <br />a <br />BUNKER LAKE BLVD <br />---------------.-----140' LTL _ <br />3� 150 300 ----- ---------------- <br />i <br />SCALE FEET — — — — — — — — <br />01, <br />I I I <br />II I II <br />nl � <br />I I—^ I I <br />I I I I <br />I I (I I I <br />I I I I I <br />` I <br />---------------------------�— <br />----------- -- <br />I- <br />I <br />I� ^I ti` jI <br />I i (I <br />"I �� I <br />I �I I I <br />I I l 1 a I <br />I 1 1 ^ <br />L——-- <br />I �� I <br />I---------------------— <br />n <br />— — — — — <br />^ I I <br />II — — — — — — —J <br />f r f f �.i► n r------------� r---------� <br />147TH AVE NW <br />---- n <br />L- ------r------- A� <br />LEGEND <br />—>—>— SANITARY SEWER <br />—�—�— WATERMAIN ~ <br />ti <br />—»—»— STORM SEWER ^' <br />.j <br />PROPOSED REGIONAL POND / <br />INFILTRATION SWALE <br />PROPOSED CONC CURB & GUTTER <br />PROPOSED BIT PAVEMENT <br />PROPOSED CONCRETE WALK <br />