My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/28/2023
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2023
>
Agenda - Council Work Session - 02/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:00:37 AM
Creation date
2/24/2023 8:29:45 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/28/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Boulevard (new infrastructure in addition to reconstruction of existing infrastructure). <br />City Staff has worked with Bolton and Menk to put together a phased approach that will ultimately provide a <br />cost and preliminary design of improvements in the area. A topographical survey and borings are needed <br />prior to putting together a design and cost estimate for the project. A copy of the proposal for the <br />Topographical Survey is attached to this case. Staff is proposing that this cost be paid for out of the EDA <br />Professional Services Fund (9230.6315). Once the Topographical Survey is complete, Bolton and Menk can <br />begin work on the Engineering Services for the West Armstrong Redevelopment Area. The Proposal for <br />Engineering Services (i.e., feasibility, preliminary design, plans and specs) for West Armstrong <br />Redevelopment Area is attached to this case and would need City Council Approval. <br />Staff is asking for action by the EDA on both of these proposals. <br />Notification: <br />Notification is not required. <br />Observations/Alternatives: <br />Observations: <br />The proposal for the Topographic Survey is for $7,955.00. Staff is recommending that the EDA authorize <br />funding this out of its Professional Services (9230-6315. the EDA does not need City Council approval for <br />this expenditure as it is within the the EDA annual approved budget. <br />The proposal for Engineering Services for West Armstrong Redevelopment Area (Design / Plans and <br />Specs and Updated Bunker Lake Blvd Feasibility Study) is $49,835.00. It should be noted that the <br />Topographical Survey referenced in this proposal has been removed and is included in the $7,955.00 <br />Topographical Survey above. In this proposal there is also a proposed Feasibility Report Update at the line <br />item cost of $8,160. Staff has spoken with City Engineer Bruce Westby and this feasibility update could be <br />performed in-house by the City Engineering team if there is available staff capacity. Staff would ask for <br />flexibility from the EDA and a recommendation the the City Council to fund the entire cost of the study <br />(including the Feasibility Report Update) with the ability to reduce it if the work can be done internally. This <br />item cannot be authorized by the EDA and will need City Council approval. <br />Proposal for Engineering Services for West Armstrong Redevelopment Area Topographical Survey - <br />$7,955.00 - <br />Alternatives: <br />1) EDA authorize funding and order report of Engineering Services for West Armstrong Redevelopment Area <br />Topographical Survey as presented ($7,955.00) <br />2) Something else <br />Proposal for Engineering Services for West Armstrong Redevelopment Area (Design/Plans and Specs <br />and Feasibility Update) - $49,835 <br />Alternatives: <br />1) EDA recommend to City Council to Authorize the Funding and Order Engineering Services for West <br />Armstrong Redevelopment Area (Designs/Plans and Feasibility Update) as presented ($49,835)(Staff <br />Recommendation) <br />2) EDA recommend to City Council to Authorize the Funding and Order Engineering Services for West <br />Armstrong Redevelopment Area (Designs/Plans and Specs) excluding the Feasibility Report Update <br />$41 675 <br />3) Something else <br />
The URL can be used to link to this page
Your browser does not support the video tag.