Laserfiche WebLink
Project Name and/or Number: amsey COR Wetland Analysis <br />PART FOUR: Aquatic Resource Impact' Summary <br />If your proposed project involves a direct or indirect impact to an aquatic resource (wetland, lake, tributary, etc.) identify each <br />impact in the table below. Include all anticipated impacts, including those expected to be temporary. Attach an overhead view map, <br />aerial photo, and/or drawing howing all of the aquatic resou roes i n the project area and the Io ation(s) of the proposed ir�p acts. <br />Label each aquatic resource on the map with a reference number or letter and identify the impacts in the following table. <br />Aquatic <br />Type of impact Duration of Existing Plant County,, Major <br />Aquatic Resource Resource Type (fill} excavate, Impact Overall Size of Community <br />ni Watershed , <br />ID (as noted on drain, or permanent (P) Size of Impact Aquatic Type(s) in and Bank <br />(wetland, lake, r r Resource � er�4 Area # <br />overhead view) remove orTempo � � <br />tributary etc.) 1 Impact Area 5 <br />vegetation) (T) of Impact Area <br />'If impacts are temporary; eater the duration of the impacts in days next to the "T". For example, a project with a temporary access fill that <br />would be removed after 220 days would be entered "T (2 0)"x <br />2lmpacts less than 0.01 acre should be reported in square feet. impacts 0,01 acre or greater should be reported as acres and rounded to the <br />nearest 0.01 acre. Tributary impacts must be reported in linear feet of impact and an area of impact bV indicating first the linear feet ofimpact <br />along the f owline of the stream followed by the area impact in parentheses). For example, a project that impacts 50 feet of a stream that is <br />feet vide would be reported as 50 ft (300 square feet). <br />3This is generally only applicable if you are a pplyi ng for a de minim is exemption under MN Pules 84 0,0420 Subp. 8, otherwise enter "N/A". <br />41jse Wetland Pion is and Flag t Community Types of Min neso to rind Wisconsin 3 rd E d . as mod if i ed i n M N R u I e s 84 2 0.040 5 Su b p. 2. <br />r efer to Major Watershed and Bank service Area maps in MN Rules 8420.0522 5ubp. 7. . <br />If any of the above identified impacts have already occurred, identify which impacts they are and the circumstances associated <br />with each: <br />NIA <br />PART FIVE: Applicant Signature <br />El heck here if you are requesting a pre -application, consultation with the Corps and L LB based an the information you have <br />provided. e u latory entities will not i vitiate a formal application r vievw if this box is checked. <br />By signature below, I attest that the i nforrnation in thi s application i s cornpl etc and accu rate. I f urther attest that i possess the <br />authority to undertake the work described herein+ <br />Sign a tu re: 1�.Z.- � I%.- Date: <br />I hereby authorize Bolton & l eak.. Inc to act on my behalf as my agent in the processing of this application and to furnish, upon <br />request* supplemental information in support of this application. <br />1, The ter "Impact" as used in this joint application form is a generic term used for disclosure purposes to identify <br />activities that may .requite approval from one or more regulatory agencies. For purposes of this form it Is not meant to <br />Indicate whether or not those activtties may require m Iti atinn/replacement. <br />Page 2 <br />