Laserfiche WebLink
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br />�4 S <br />c iJ <br />16� -91 ;MMI <br />T-■■I" ■ <br />I <br />n IW <br />- �. ■mac— _ � ■ <br />Restroom + Maintenance Bldg <br />PROJECT DESCRIPTION <br />Aproposed Restroom + Maintenance Building will be sided with the same materials as the <br />adjacent Pump House #3. This building will support community activities at Center Street's <br />Municipal Plaza. It will also house equipment for the plaza's irrigation system and for the <br />solar array at the Pump House building. <br />Note: the sequence of project design and construction will begin with Pump House <br />Building facade improvements, followed by Pump House Plaza site and landscape <br />improvements, and then additional project feasibility evaluation and detailed design <br />related to the Rest Room + Maintenance Building. <br />■ <br />7 <br />■ <br />■ <br />z —MEW61. � — e <br />WARD <br />-ti, v5 <br />d —A <br />FOI A TAN <br />RE l5 AND EQU NIENT R 1S PLAN <br />11 <br />