My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/28/2023
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2023
>
Agenda - Council Work Session - 02/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:00:37 AM
Creation date
2/24/2023 8:29:45 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/28/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br />;-------------�� <br />1 , 1 <br />1 <br />' Parallel parking <br />1 f <br />bay (both sides) <br />1 <br />1 1 <br />1 i 1 <br />1 <br />Sto rmwate r <br />1 <br />1 catchment <br />1 r, <br />' basins <br />1 <br />1 <br />I ; Y <br />1 1 <br />.� •ti r. <br />1 1 YY <br />Center Street <br />n o Concept Plan <br />----;---------% <br />Replace existing <br />to match new curb <br />and utter, storm - <br />water water catchment <br />basins and other <br />proposed improve- <br />ments in this area. <br />`�- <br />-% <br />Keep existing curb/ <br />gutter, concrete <br />walk/Regional Trail <br />, <br />and street pave- <br />---------------- <br />1 <br />ment in this area. <br />r� <br />Regional Stormwater Catchment Parallel 10' Wide <br />Trail Basin (both sides) Parking Bay (both Concrete Walk <br />sides) <br />Center Street <br />PROJECT DESCRIPTION <br />The primary purpose of the Conceptual Site Plan for Center Street is to illustrate how this key <br />north/south connector ties together all the other pieces of this Framework+ Policy Plan. <br />At the same time, it also promotes various opportunities for innovative district infrastructure <br />as an integral part of current and proposed street, park, trail and private development <br />project design - suggesting shared systems for stormwater capture/reuse, energy <br />production/distribution, waste handling/recycling and other technologies. <br />It's important to note however, that this <br />document also presents a somewhat <br />cautious approach, seeking to minimize <br />disruption to existing Center Street im- <br />provements. The basic objective is to work <br />with existing curb lines, parking bays and <br />other pavement dimensions as the starting <br />point for completing street construction to <br />Ramsey Parkway and northward to Bunker <br />Lake Boulevard. (Also refer to the Sapphire <br />Apartments Frontage and Central Anoka <br />County Regional Trail information in this Plan) <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.