Laserfiche WebLink
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br />Future Development Site Frontage Project Elements <br />10' Concrete Walk <br />0�,A J <br />Stormwater <br />Catchment Basin - <br />width to match depth <br />of parking bay <br />d <br />B Type Curb <br />with Curb cuts <br />to Al I ow Water <br />Inflow <br />Ilk <br />e�w <br />' � 4 <br />� L <br />F <br />o o <br />Center Stormwater <br />Street Catchment Basin <br />Stormwater catchment basins will be connected to existing <br />storm sewer located in Center Street - future phases will route <br />this water to underground cisterns in Municipal Plaza for <br />irrigation and other re -use purposes. <br />loop- <br />PEPFM <br />10' wide Private Plaza <br />Concrete Walk for Public Use <br />■90 <br />i J <br />b i`L. "7. r. �.• - • lei �l Tr.• <br />32 <br />