Laserfiche WebLink
Probable Construction Costs <br />Municipal Plaza - North <br />DIVISION <br />DESCRIPTION <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />UNITS <br />UNIT <br />COST <br />TOTAL <br />COST <br />GENERAL REQUIREMENTS <br />$ 27,900 <br />MOBILIZATION (3%) <br />1 <br />LUMP <br />$ 27,900.00 <br />$ 27,900 <br />EARTHWORK <br />$ 108,467 <br />COMMON EXCAVATION <br />2 281 <br />CU YD <br />$ 20.00 <br />$ 45,626 <br />SLOPE PROTECTION <br />507 <br />SQ YD <br />$ 8.50 <br />$ 4,309 <br />SELECT GRANULAR BORROW AND ROUGH GRADING <br />2 281 <br />CU YD <br />$ 25.00 <br />$ 57,032 <br />TOPSOIL BORROW AND ARCHITECTURAL GRADING <br />50 <br />CU YD <br />$ 30.00 <br />$ 1,500 <br />CONCRETE WALKS AND STREET <br />$ 444,559 <br />CURB AND GUTTER <br />830 <br />LF <br />$ 18.00 <br />$ 14,940 <br />DETECTABLE CURB RAMPS <br />4 <br />EA <br />$ 1,500.00 <br />$ 6,000 <br />4" CONCRETE WALK <br />14 925 <br />SF <br />$ 6.00 <br />$ 89,550 <br />BITUMINOUS TRAILS <br />LF <br />$ 4.00 <br />$ - <br />PERVIOUS PAVERS (INCL BASE) <br />2050 <br />SF <br />$ 30.00 <br />$ 61,500 <br />BITUMINOUS WEAR COURSE (2") <br />285 <br />TON <br />$ 100.00 <br />$ 28,507 <br />BITUMINOUS NON -WEAR COURSE (2") <br />285 <br />TON <br />$ 90.00 <br />$ 25,657 <br />AGGREGATE BASE <br />728 <br />CY <br />$ 22.00 <br />$ 16,005 <br />FOUNTAINS <br />ARCHITECTURE <br />STAIRS AND WALLS <br />$ - <br />FENCE/SCREEN <br />$ 40,000 <br />DECORATIVE FENCE <br />400 <br />LF <br />$ 100.00 <br />$ 40,000 <br />FURNISHING <br />$ 61,200 <br />KIOSK (ARTFUL STRUCTURE, PARK SIGN AND INTERPRETIVE SIGN) <br />1 <br />EA <br />$ 15,000.00 <br />$ 15,000 <br />RECEPTACLES <br />4 <br />EA <br />$ 1,500.00 <br />$ 6,000 <br />BENCHES <br />4 <br />EA <br />$ 2,500.00 <br />$ 10,000 <br />BIKE RACKS <br />2 <br />EA <br />$ 1,500.00 <br />$ 3,000 <br />FIRE TABLE <br />2 <br />EA <br />$ 3,000.00 <br />$ 6,000 <br />DRINKING FOUNTAIN <br />1 <br />EA <br />$ 5,000.00 <br />$ 5,000 <br />PICNIC TABLES <br />5 <br />EA <br />$ 3,000.00 <br />$ 15,000 <br />PLAY EQUIPMENT? <br />EA <br />$ 50,000.00 <br />$ - <br />TREE GRATE <br />1 <br />EA <br />$ 1,200.00 <br />$ 1,200 <br />LIGHTING <br />$ 55,800 <br />PEDESTRIAN POLE LIGHTS <br />31 <br />EA <br />$ 1,800.00 <br />$ 55,800 <br />STORMWATER RE -USE AND TREATEMENT <br />$ 195,500 <br />COLLECTION, CLEAN AND REUSE <br />0.9 <br />ACRE <br />$ 230,000.00 <br />$ 195,500 <br />GENERAL PLANTING <br />$ 112,400 <br />TREES <br />35 <br />EA <br />500.00 <br />17,500.00 <br />SM TREES <br />31 <br />EA <br />400.00 <br />12,400.00 <br />PLANTING SOIL <br />730 <br />CY <br />30.00 <br />21,900.00 <br />PERENNIALS/SHRUBS <br />2700 <br />SF <br />8.00 <br />21,600.00 <br />NATIVE SEEDING W/ PLUGS <br />0.3 <br />ACRE <br />5000.00 <br />1,500.00 <br />SOD <br />650 <br />SY <br />8.00 <br />5,200.00 <br />IRRIGATION <br />19700 <br />SF <br />1.00 <br />19,700.00 <br />ALUMINUM EDGING <br />1200 <br />LF <br />8.00 <br />9,600.00 <br />MULCH W FABRIC <br />300 <br />SY <br />10.00 <br />3,000.00 <br />UTILITIES <br />$ 50,000 <br />STORM, WATER, POWER <br />1 <br />LUMP <br />$50,000.00 <br />$ 50,000 <br />ESTIMATED CONSTRUCTION COSTS $ 1,095,826 <br />10% DESIGN CONTINGENCY 10% $ 109,600 <br />ESTIMATED CONSTRUCTION COSTS $ 1,205,426 <br />