Laserfiche WebLink
Probable Construction Costs <br />Municipal Plaza - South <br />DIVISION <br />DESCRIPTION <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />UNITS <br />UNIT <br />COST <br />TOTAL <br />COST <br />GENERAL REQUIREMENTS <br />$ 48,000 <br />MOBILIZATION (3%) <br />1 <br />LUMP <br />$ 48,000.00 <br />$ 48,000 <br />EARTHWORK <br />$ 53,714 <br />COMMON EXCAVATION <br />959 <br />CU YD <br />$ 20.00 <br />$ 19,187 <br />SLOPE PROTECTION <br />213 <br />SQ YD <br />$ 8.50 <br />$ 1,812 <br />SELECT GRANULAR BORROW AND ROUGH GRADING <br />959 <br />CU YD <br />$ 25.00 <br />$ 23,983 <br />TOPSOIL BORROW AND ARCHITECTURAL GRADING <br />291 <br />CU YD <br />$ 30.00 <br />$ 8,732 <br />CONCRETE WALKS AND STREET <br />$ 223,853 <br />CURB AND GUTTER <br />LF <br />$ 18.00 <br />$ - <br />DETECTABLE CURB RAMPS <br />EA <br />$ 1,500.00 <br />$ - <br />4" CONCRETE WALK <br />23 200 <br />SF <br />$ 6.00 <br />$ 139,200 <br />BITUMINOUS TRAILS <br />LF <br />$ 4.00 <br />$ - <br />PERVIOUS PAVERS (INCL BASE) <br />2 470 <br />SF <br />$ 30.00 <br />$ 74,100 <br />BITUMINOUS WEAR COURSE (2") <br />TON <br />$ 100.00 <br />$ - <br />BITUMINOUS NON -WEAR COURSE (2") <br />TON <br />$ 90.00 <br />$ - <br />AGGREGATE BASE <br />480 <br />CY <br />$ 22.00 <br />$ 10,553 <br />FOUNTAINS <br />$ 310,000 <br />RIBBON <br />1 <br />LUMP <br />$ 60,000.00 <br />$ 60,000 <br />STEPS (INCLUDES CONCRETE STEPS, MECHANICAL, FINISHES) <br />1 <br />LUMP <br />$ 250,000.00 <br />$ 250,000 <br />ARCHITECTURE <br />? <br />SF <br />$ - <br />STAIRS AND WALLS <br />$ 225,630 <br />6" RISERS <br />232 <br />SF <br />$ 90.00 <br />$ 20,880 <br />12" H SEAT WALLS (+18" buried) <br />1 353 <br />LF <br />$ 150.00 <br />$ 202,950 <br />RAILINGS <br />24 <br />LF <br />$ 75.00 <br />$ 1,800 <br />FENCE/SCREEN <br />$ 30,000 <br />DECORATIVE FENCE <br />300 <br />LF <br />$ 100.00 <br />$ 30,000 <br />FURNISHING <br />$ 71,100 <br />KIOSK (ARTFUL STRUCTURE, PARK SIGN AND INTERPRETIVE SIGN) <br />1 <br />EA <br />$ 15,000.00 <br />$ 15,000 <br />RECEPTACLES <br />6 <br />EA <br />$ 1,500.00 <br />$ 9,000 <br />BENCHES <br />6 <br />EA <br />$ 2,500.00 <br />$ 15,000 <br />BIKE RACKS <br />1 <br />EA <br />$ 1,500.00 <br />$ 1,500 <br />FIRE TABLE <br />4 <br />EA <br />$ 3,000.00 <br />$ 12,000 <br />DRINKING FOUNTAIN <br />EA <br />$ 5,000.00 <br />$ - <br />PICNIC TABLES <br />1 <br />EA <br />$ 3,000.00 <br />$ 3,000 <br />TREE GRATE <br />13 <br />EA <br />$ 1,200.00 <br />$ 15,600 <br />PLAY EQUIPMENT? <br />EA <br />$ 50,000.00 <br />$ - <br />LIGHTING <br />$ 68,400 <br />PEDESTRIAN POLE LIGHTS <br />38 <br />EA <br />$ 1,800.00 <br />$ 68,400 <br />STORMWATER RE -USE AND TREATEMENT <br />$ 299,000 <br />COLLECTION, CLEAN AND REUSE <br />1.3 <br />ACRE <br />$ 230,000.00 <br />$ 299,000 <br />GENERAL PLANTING <br />$ 265,128 <br />TREES <br />33 <br />EA <br />500.00 <br />16,500.00 <br />SM TREES <br />27 <br />EA <br />400.00 <br />10,800.00 <br />PLANTING SOIL <br />1200 <br />CY <br />30.00 <br />36,000.00 <br />PERENNIALS/SHRUBS <br />15485 <br />SF <br />8.00 <br />123,880.00 <br />NATIVE SEEDING W/ PLUGS <br />0 <br />ACRE <br />S000.00 <br />- <br />SOD <br />2266 <br />SY <br />8.00 <br />18,128.00 <br />IRRIGATION <br />32700 <br />SF <br />1.00 <br />32,700.00 <br />ALUMINUM EDGING <br />1240 <br />LF <br />8.00 <br />9,920.00 <br />MULCH W FABRIC <br />1720 <br />SY <br />10.00 <br />17,200.00 <br />UTILITIES <br />STORM, WATER, POWER <br />1 <br />LUMP <br />$50,000.00 <br />$ 50,000 <br />ESTIMATED CONSTRUCTION COSTS <br />10% DESIGN CONTINGENCY 10% $ <br />ESTIMATED CONSTRUCTION COSTS $ <br />1,644,824 <br />164,500 <br />1,809,324 <br />