My WebLink
|
Help
|
About
|
Sign Out
Home
10/04/88
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1988
>
10/04/88
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 11:10:27 AM
Creation date
2/24/2006 11:59:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission
Document Date
10/04/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Gerald Zimmerman <br />Page 2 <br />September 30, 1988 <br /> <br />5. B-1 Business District Zoning specifies a setback of 35 feet for <br /> the rear yard. In this case with Highway 10 frontage, the <br /> applicant contends that the area behind the building should be <br /> viewed as a sideyard (setback would be 20'). The site plan <br /> shows a setback of 12 feet from the east side of the lot. The <br /> setback would need to be corrected or a variance would have to <br /> be granted. <br /> <br />6. City Code 170.D15F requires the finished lot grade elevation of <br /> all buildings to be a minimum of 18 inches above the centerline <br /> grade of the adjacent public roadway. The grading plan <br /> indicates a slab elevation of 865. <br /> <br />7. The applicant's estimated water usage appears to be excessive <br /> and should be re-evaluated for design of the septic system (see <br /> attached letter). <br /> <br />Particular attention needs to be given to stormwater runoff and <br />holding for this property. A drainage easement may be required <br />dependent on submittal of final grading plans. <br /> <br />The building information and preliminary plans appear to be <br />consistent with the intent of City Ordinances. The applicant <br />will require a CUP for the proposed advertising sign. <br /> <br />10. <br /> <br />No soil borings or perc tests have been conducted as yet. The <br />applicant has indicated that final plans would be submitted <br />contingent upon city approvals. All final plans must be <br />certified by an architect er engineer. The applicant has <br />indicated that, if approved, he intends to start construction <br />next spring. <br /> <br />Recommendation: <br /> <br />We recommend tabling action on this l~em until such time that <br />traffic concerns and site drainage have been sufficiently <br />addressed. <br /> <br />Sincerely, <br /> <br />HAKANSON ANDERSON ASSOCIATES~, INC. <br /> <br />Mer~nd Otto <br />/mlc <br />File: RA2:15-67 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.