Laserfiche WebLink
CASE #: / <br /> <br /> Continued Public Hearing <br />REQUEST FOR PRELIMINARY PLAT OF SHADE TREE CREEK; <br />CASE OF SHADE TREE CONSTRUCTION <br /> By: Breanne Dalnes, Associate Planner <br /> <br />Background: <br /> <br />Shade Tree Construction has applied for preliminary plat to develop 16 single-family lots on the <br />property generally located south of 177th Avenue. <br /> <br />The following items are enclosed for your information: <br /> <br /> a) Site location map <br /> b) Preliminary Plat, current and future plans <br /> c) Grading Plan <br /> d) Utility Plan <br /> e) Landscaping Plan <br /> f) Tree Inventory and Preservation Plan <br /> g) Packet of letter from residents <br /> h) Minutes from Planning Commission meeting on May 5, 2005 <br /> i) Minutes from Planning Commission meeting on February 3, 2006 <br />j) City Staffreview letter dated January 27, 2006, revised February 28, 2006 <br /> <br />Notification: <br /> <br />The public heating remained open and was continued from the February 2, 2006 Planning <br />Commission meeting. <br /> <br />Observations: <br /> <br />The applicant is proposing to create 16 single-family lots on approximately 40 acres. The <br />property is currently located in the R-I Rural Developing district, with a maximum density of 1 <br />lot per 2.5 acres, or 0.4 units per acre. As submitted, the preliminary plat is proposing a gross <br />density of .4 units per acre. All of the proposed lots appear to meet the cluster standards for R-I <br />Rural Developing. Lots conform to minimum and maximum lot width, size, and frontage on a <br />public road, with the exception of Lot 9, Block 3 which appears slightly larger than permitted. <br /> <br />Information regarding the community septic system, including soil testing, design of the system, <br />and exact location, has been submitted, and Staff is currently reviewing the materials. <br /> <br />A utility plan outlining the installation of sewer and water facilities has also been submitted and <br />is in the process of being reviewed by City Staff. The applicant has submitted materials <br /> <br /> <br />