Laserfiche WebLink
PROJECT EXCLUDING BAUGH STREET <br /> <br />ESTIMATED COSTS <br /> <br />Item <br /> <br />Estimated Quantity <br /> <br />Bituminous Surfacing <br />Class V Gravel <br />Grading & Channel Cleaning <br />Culvert Cleaning & Culvert <br /> Installation <br /> <br />1,800 Tons <br />3,100 Tons <br />Lump Sum <br /> <br />Lump Sum <br /> <br />Estimated Construction Cost <br /> <br />Contingencies, Engineering & Administrative <br /> <br />ESTIMATED PROJECT COST <br /> <br />Estimated Cost <br /> <br />$ 42,300 <br /> 15,500 <br /> 12,000 <br /> <br />3,000 <br />$ 72,800 <br />18~200 <br />$ 91,000 <br /> <br />COST SUI,~MARY <br /> <br />Total Costs <br /> <br />Total Units <br /> <br />Cost Per Unit <br /> <br />Annual Unit Cost (10 Years) <br /> <br />91,000.00 <br /> <br />45 <br />~2,022.22. <br /> <br /> 329.02 <br /> <br /> <br />