My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/18/1981 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
1981
>
Agenda - Council - 08/18/1981 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:52:25 PM
Creation date
2/28/2006 8:08:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
08/18/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of <br />referred to as <br />referred to as <br />referred to as the <br /> <br /> WHEREAS, <br /> <br />THIS AGREEMENT made and entered into by and between <br />Minnesota, Department of Transportation, hereinafter <br /> <br />the "State", and the County of Anoka, <br /> <br />the "County", and the City of Ramsey, <br /> "City"~ WITNESSETH: <br /> the State has determine~ that there <br /> <br />the <br /> <br />cation and it is in the public's best <br />flc control signal with street lights <br />No.10 at Sunfish Lake Boulevard (County <br />and <br /> <br />hal with street lights and <br />cent Federal-aid Funds; and <br /> <br />hereinafter <br /> <br />hereinafter <br /> <br /> is justifi- <br />interest to install a traf- <br />and signing on Trunk Highway <br /> <br /> State Aid Highway No. 57); <br /> <br />WHEREAS, it iS anticipated that the traffic control sig- <br /> <br /> signing work is eligible for 76.74 per- <br /> <br /> WHEREAS, the County, City and State will participate in <br />the cost, maintenance and operation of said traffic control signal <br /> <br />with street lights and signing as hereinafter set forth; <br /> NOW, THEREFORE~ IT IS AGREED AS FOLLOWS: <br /> <br /> 1. The state ehall prepare the necessary plan, spe- <br />cificatlons and proposal and shall perform the engineering and <br />inspection required to complete the items of work hereinafter set <br />forth. Such work as described immediately abo~e shall constitute <br />"Engineering and Inspection" and shall be so referred to hereinaf- <br /> <br />ter o <br /> <br /> .'~. <br />contracted, the cost <br />required to complete <br /> <br />The contract cost of the work .or, if the work is not <br /> of all labor, materi~ls and equipment rental <br /> the work, except the cost of providing the <br /> <br />'60582 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.