My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/30/1981 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
1981
>
Agenda - Council - 06/30/1981 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:39:08 PM
Creation date
2/28/2006 9:07:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
06/30/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORM DRAINAGE IMPROVEMENTS: <br />To alleviate the drainage problems in Bower's Mississippi Acres, it is proposeU <br />to construct a storm sewer to the Mississippi River as shown on Exhibit A. The <br />proposed storm sewer would consist.of a 21 inch concrete pipe outletting into the <br />Mississippi River and 18 inch pipe along Bower's Drive. Catch basins would be pro- <br />vided at the three low points as shown on Exhibit A. Since the drainage problem <br />exists in Bower's Mississippi Acres, only those properties adjacent to Bower'$ <br />Drive in Section 30 Would be assessed for storm sewer. <br /> <br />COSTS: <br />Estimated costs and estimated quantities for the proposed improvements are as <br /> <br />follows: <br /> <br /> ESTIMATED COSTS <br />Street & Drainage Improvements - Bower's Mississippi Acres & Adjacent <br /> <br /> Item <br />Bituminous Surfacing <br />Class V Gravel <br />Grading and Widening <br />Storm Sewer <br />Restoration <br /> <br />Unplatted Areas <br /> <br />Estimated Quantity_ Estimated Cost <br />1100 Ton $ 28,600 <br />1700 Ton 9,775 <br />Lump Sum 17,000 <br />Lump Sum 46,450 <br />Lump Sum 8,050 <br /> <br />Estimated Construction Cost <br />Contingencies, Engineering, Administrative & <br />Easements <br /> <br />ESTIMATED PROJECT COST <br /> <br />$109,875 <br /> <br /> 30,975 <br />$140,850 <br /> <br />3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.