My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/30/1981 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
1981
>
Agenda - Council - 06/30/1981 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:39:08 PM
Creation date
2/28/2006 9:07:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
06/30/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
potential flooding problems should be required to install driveway culverts. <br />This work is proposed to be done by the owner of the affected property, with <br />the exception of those areas where ditch lowering or drainage patterns are changed. <br /> <br />C6sts: <br />Estimated costs and estimated quantities are provided below for the proposed <br /> <br />improvements. <br /> <br />ESTIMATED COSTS <br /> <br />Item. <br /> <br />Bituminous Surfacing <br />Class V Gravel <br />Grading & Channel Cleaning <br />Culvert Cleaning & Culvert <br /> Installation <br />Restoration <br /> <br />Estimated~ <br /> <br />Estimated Cost- <br /> <br />4050 Ton $ 97,200 <br />7000 Ton 35,00D <br />Lump Sum 22,000 <br /> <br />Lump Sum <br />Lump Sum <br /> <br />Estimated.Construction Cost <br />Contingencies, Engineering, Administrative .& Easements <br /> <br />ESTIMATED PROJECT COST <br /> <br /> 6,000 <br /> 12,000 <br /> <br />$172,200 <br /> <br /> 48,050 <br />$220,250 <br /> <br /> Financing and Assessment: <br />In accordance with th~ City of Ramsey's current street assessment policy, the <br />· proposed improvements are proposed to be financed by special assessments to the <br /> benefiting property on a per unit basis. <br /> <br />The benefited area is shown on Exhibit A. <br /> <br />The following table provides a cost summary for the project ~ased on the total <br />estimated cost, unit cost and annual amortized unit costs projected at 10 percent <br /> <br />interest for'a period of 10 years. <br /> <br />4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.