My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/28/1981
Ramsey
>
Public
>
Agendas
>
Council
>
1981
>
Agenda - Council - 07/28/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:39:18 PM
Creation date
2/28/2006 9:13:18 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/28/1981
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
require construction of a drainage outlet to the Mississippi River as shown in <br />the Comprehensive Storm Drainage Plan for the City of Ramsey. <br />It is not anticipated that the drainage will create any major problems with only <br />occasional flooding of the low areas occurring during heavy rains and during snow <br />melt prior to the disappearance of frost in the spring. Therefore, ditch cleaning <br />in some areas would be proposed at this time. It is also proposed to obtain <br />drainage easements over the ponding areas as shown on Exhibit A. <br />Some existing driveways presently do not have driveway culverts. While not all <br />driveways would need a driveway culvert, those lots which presently may cause <br />potential flooding problems should be required to install driveway culverts. <br />This work is proposed to be done by the owner of the affected property, with the <br />exception of those areas where ditch lowering or drainage patterns are changed. <br />COSTS <br />Estimated costs and estimated quantities are provided below for the proposed <br />improvements. <br />• <br />Item <br />Bituminous Surfacing <br />Class V Gravel <br />Shaping and Widening <br />Channel Cleaning <br />ESTIMATED COSTS <br />Estimated Quanti <br />Estimated tee t <br />$17,600 <br />6,300 <br />3,400 <br />500 <br />$27,800 <br />8,500 <br />$36,300 <br />Rev. 7/16/81 <br />3 <br />750 Tons <br />1,250 Tons <br />Lump Sum <br />Lump Sum <br />Estimated Construction Cost <br />Contingencies, Engineering, Administrative & Easements <br />ESTIMATED PROJECT COST <br />
The URL can be used to link to this page
Your browser does not support the video tag.