My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 03/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 9:19:40 AM
Creation date
3/16/2023 3:51:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Future Year Traffic Operations Analysis <br />Turning movements were estimated for the year 2040 No Improvement and Baseline scenarios. The <br />future year turning movements were estimated using the existing turning movements and adjustments <br />were applied based on future traffic growth and travel pattern shifts predicted for each scenario. These <br />future year turning movements were evaluated in the traffic operations model to evaluate the <br />performance of each scenario. The results of the future year traffic operations analysis are reported as <br />level of service (LOS) and include estimated delay at each approach. <br />Year 2040 No Improvement Scenario <br />The Year 2040 No Improvement Scenario includes the year 2040 SE data assumptions and the existing <br />year 2018 roadway network. To determine how the CSAH 5 corridor will accommodate the Year 2040 <br />No Improvement Scenario forecasts, an intersection capacity analysis was completed using <br />Synchro/SimTraffic software. Results of the Year 2040 No Improvement Scenario capacity analysis <br />are shown in Table 7. <br />Table 7: Year 2040 No Improvement Scenario Operations Analysis <br />AM Peak PM Peak <br />LOS Delay (sec.) LOS Delay (sec.) <br />CSAH 64 (181st Ave) * A/A A/A <br />CSAH 63 (Green Valley Rd)* A/C C/F 71 <br />CSAH 63 (175th Ave)* A/A A/A 7 <br />170th Ave A B 17 <br />167th Ave* A/C 16 A/D 33 <br />Ramsey Blvd* A/A 7 A/C 25 <br />Sunfish Lake Blvd* A/A 5 A/B 12 <br />Alpine Dr* B 16 B 20 <br />Sunwood Dr* A/B 13 A/A 10 <br />Dysprosium St* A/A 9 A/A 9 <br />TH 47 B 14 C 26 <br />* Side stop -controlled intersections show overall intersection LOS followed by the LOS of the worst of the worst performing approach. Delay <br />shown is that of the worst performing approach. <br />Intersecting Roadway <br />Results of the Year 2040 No Improvement scenario capacity analysis indicate that all study <br />intersections currently operate at an overall acceptable overall LOS C or better during the weekday <br />peak hours. The westbound approach at the CSAH 62 (Green Valley Road) intersection operates at a <br />LOS F with a delay of 71 seconds. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.