My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/14/2006
Ramsey
>
Public
>
Agendas
>
Council
>
2006
>
Agenda - Council - 03/14/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 3:00:46 PM
Creation date
3/10/2006 2:41:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/14/2006
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Code Compliance. The CITY approves the Plat conditioned on the DEVELOPER <br />developing the Plat in accordance with the applicable provisions of City Code, Section 9.50, <br />entitled Subdivision. <br /> <br />2. Conformance with Plan. The Plat shall be developed pursuant to the Final Plat Plan, <br /> Utility Plans; Sanitary Sewer and Watermain Construction; Storm Sewer and Street <br /> Construction; Grading, Erosion Control and Details; Landscape Plan and Tree Inventory; <br /> dated February 2, 2006, prepared by Passe Engineering. <br /> <br />3. Incorporation of All City Code Requirements. That the recitals above and the applicable <br /> provisions of the City Charter, Subdivision Code, Zoning Code and Public Improvement <br /> Code of the CITY, as amended to date hereof, are incorporated herein by reference. <br /> <br />4. Stage I Improvements Required. The ~nprQvements the CITY requires the <br /> DEVELOPER to construct within the Plat are'as follows:~ <br /> <br />no <br /> <br />Trunk and lateral sanitary sewer system <br />Trunk and lateral watermains and appurtenances <br />Streets with concrete curb and gutter <br />Trunk and lateral storm drainage facilities <br />Lot grading and permanent erosion control <br />Sidewalk Construction along Limonite Street N.W., I67th Terrace N.W., Olivine <br />Street N.W., 170th Trail N.W. <br />Trail construction along the Trott Brook corridor from the western boundary of <br />the plat to CSAH 5 <br />Natural gas <br />Telephone service <br />Electric service <br />Street lights (installment arranged by CITY during Stage [ Improvements and <br />paid for by DEVELOPER as Stage II Improvement) <br /> <br />("Stage I Improvements") <br /> <br />Th~ DEVELOPER agrees to construct the Stage I Improvements accordIng to the terms and <br />conditions of this agreement and in accordance with DEVELOPERS' plans submitted to the <br />CITY: Utility Plans; Sanitary Sewer and Watermain Construction; Storm Sewer and Street <br />Construction; Grading, Erosion Control and Details, dated February 2, 2006, prepared by <br />Passe Engineering. The final construction plan for the Stage I Improvements shall be <br />submitted to the City Engineer for review and approval prior to commencement of <br />construction. <br /> <br />The DEVELOPER shall be responsible for completing the rough grading and providing lot <br />corner stakes prior to the installation of underground utilities. All permanent lot corners shall <br />be in place prior to the release of the Stage I financial guarantee. <br /> <br />Brookfield First Addition <br />Development Agreement <br />Page 4 of 14 <br /> <br />-163- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.