Laserfiche WebLink
CENTRA HOMES,, <br />We have designed the detached residential portion of the concept plans into two distinct <br />neighborhoods with the Twenty (20) Wide Homes on the western side and the Thirty (30') Wide <br />Homes on the eastern side of the Neighborhood. <br />The 20 foot wide homes would be essentially the same homes that we built at the neighborhood <br />`Cottages at the COR' located at the corner of Bunker Lake Blvd and Ramsey Blvd. This <br />neighborhood is completely built out. We have included a photo of a row of completed homes <br />from the neighborhood for reference as well as marketing flyers that show floorplans and <br />elevations. <br />The 30 foot wide homes would be a new product that we would design specifically for this <br />neighborhood. We envision a home with garages in the rear and front porches seen from the <br />public streets. We do not have a picture or architectural renderings of these plans because we <br />have not designed them yet. We would design homes that are similar in architectural finishes <br />and would complement the two story homes that are part of this submittal. <br />As you know the Housing Market is going through some tremendous changes as Interest Rates <br />continue to increase. We expect our homes to be priced in the Mid to Upper $ 300,000 and <br />depending on the options that a Buyer might select some homes could sell for over $ 400,000. <br />We proposed the following specifics of house and lot details of both home types we propose: <br />• Architectural Asphalt Shingles <br />• Vinyl Siding with a variety of exterior masonry accents <br />• Landscaping to include One front yard tree per lot and fully irrigated and sodded yard - <br />there would be additional landscaping along the public trail and road <br />• Variety of Exterior Color selections <br />• Do not allow the same color and elevation of homes next to or across the street from <br />each other <br />• 5 foot side yard setbacks <br />Wetland Impact. <br />The Wetlands on this site provided a unique challenge to developing the site. <br />Our concept contemplates filling all of the wetlands and mitigating the filling of these wetlands <br />by either off -site wetland creation or purchasing wetland credits. As a more detailed review of <br />the cost of mitigation and the generation of future TIF/Tax Revenue are completed, the total <br />amount of Wetland Impact might be reduced. <br />