My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 03/28/2023
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2023
>
Agenda - Council Work Session - 03/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:11:08 AM
Creation date
3/27/2023 3:37:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
03/28/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Work Session <br />Meeting Date: 03/28/2023 <br />Information <br />Title: <br />Request for Feedback on Preliminary Development Proposals for Parcel 46 <br />Purpose/Background: <br />2.1. <br />Background: <br />City Staff, at the direction of the City Council, has received an updated COR Analysis Update (2023 <br />COR Report) dated February 2023. This report updated a 2018 report and went into a more detailed <br />analysis into the existing wetlands, costs to begin work on the excavation of the Waterfront, site <br />preparation/soil correction for low sites owned by the City and estimated costs for City Sewer, City <br />Water, City Stormwater and Road costs. Summary exhibits are attached to this case due to the lengthy <br />size of the full report. <br />City staff has received development inquires the past few years for Parcel 46 but has not been in a <br />position to begin meaningful negotiations with interested parties due to the lack of relevant information <br />on this site. Parcel 46 was identified as a large commercial site for "Big Box Retail" in the original <br />master plan and for COR. The City Council, EDA and Planning Commission within the past five years <br />have reviewed preliminary concepts varying from all residential to a blend of residential and <br />commercial. Staff has received mixed feed back from the Council, Planning Commission and EDA but <br />all have been supportive of a blend of uses on this site due to changing market conditions. <br />The 2023 COR report has provided some clarity relating to wetlands and the ability to fill them, road <br />alignments and estimated costs to bring the site up to a buildable/developable elevation. City Staff has <br />shared relevant data from the 2023 Study with multiple developers that have expressed a recent <br />interest in development of the site and has asked them to bring forth some preliminary development <br />proposals to the City Council. (See attached). Staff has asked the developers to use this site template <br />for their concept plans reserving an area for a future 98 unit Hilton Home 2 Suites and to show how the <br />projects would complement each other. PDF's for each preliminary development proposal layout and <br />narratives are attached. Brief summaries of the proposals are included in the text below: <br />Norhart (Projects 1 and 2) <br />3.2 Acre Lot <br />150 Unit, Mixed Use, 5 Story, Market Rate Apartment <br />Norhart glass corner feature <br />Multiple Building Amenities - See Narrative <br />Multiple Unit Amenities - See Narrative <br />Multiple Exterior Amenities - See Narrative <br />500 SF ground level retail space (i.e Jimmy Johns, Jamba Juice, Coffee Shop) <br />Heated Underground Parking Available <br />$37,5001000 - Tax Assessed Valuation Estimate (250K/Unit) <br />$51700 - Annual Taxes (4A - Apartment) <br />$4321000 - Local Taxes (4A - Apartment) <br />Capstone Homes Project 1 <br />168 - 2 Story Townhomes <br />For Sale - Owner Occupied <br />23.7 Gross Acres <br />+/- 18 acres developed <br />
The URL can be used to link to this page
Your browser does not support the video tag.