Laserfiche WebLink
CC Regular Session 5.7. <br />Meeting Date: 03/28/2023 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />Title <br />p • r fn7n'�/� C�ar►i1 Tmr�rnvr�r AmAt prnr�r�am n;AcThis case was moved to the Regular <br />- - - - - ----Z:) - - - - - - I - -r - --- - - I - --- - -- <br />Agenda to be considered as case 7.3 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23-062 ordering request for proposals for topographic surveys, <br />geotechnical evaluations and utility testing for 2024 Capital Improvement Program projects. <br />Background: <br />The current 2023 through 2032 10-Year Capital Improvement Program (CIP) proposes street reconstruction or <br />pavement overlays of the following subdivisions in 2024: <br />• IP 24-01 Barthel's Rum River &White Pines Estates Street Reconstructions <br />• IP 24-02 Halls Dover Acres Street Reconstructions <br />• IP 24-03 Rodeo Hills Estates & Valley View Acres Street Reconstructions <br />• IP 24-04 Ford Brook Estates 3rd Street Reconstructions <br />• IP 24-05 MSA Xkimo Street Reconstruction <br />• IP 24-06 2024 MSA Pavement Overlay Improvements <br />• IP 24-07 2024 Neighborhood Pavement Overlay Improvements <br />• IP 24-10 Section 01 Unplatted (North of CR 27) Street Reconstructions <br />• IP 24-11 MSA Alpine Drive Reconstruction <br />• IP 24-12 Juniper Wood 1 st — 3rd Street Reconstructions <br />Staff will use this information as design aids for the improvement projects. Topographic surveys are essential to <br />locate all existing site features and to create an existing ground surface, used as the base for designing the project. <br />Geotechnical reports inform Staff of subsoil conditions, which is essential when designing the pavement section <br />for the reconstructed streets. Also included in geotechnical reports are groundwater elevations and support <br />capabilities of the soils for utilities and trenches, as well as associated backfilling recommendations. Televising <br />sewer pipes informs Staff of the condition of the pipes, and locates existing damage. This allows Staff to include <br />fixing damaged pipes into the construction plans, which is more cost effective than doing repairs as standalone <br />projects, or as change orders during the project. <br />A summary of the proposed design request for proposals and a 2024 Pavement Management Program Map are <br />attached to this case for reference. <br />Notification: <br />No notifications are required with this case. <br />Observations/Alternatives: <br />