Laserfiche WebLink
1 . Park_Dedication. The flat is located in the CIT F's Prairie District. The current park <br />dedication requirement for assisted living complexes is S4.738 per acre. The amount due <br />for the Plat is Thirty One Thousand Fort,\+ Three Dollars and No Cents 4.7. .55 <br />acres — 3,77.00. The rate in effect the time this Contract is executed shall b <br />collected. The park dedication fee shall be paid to CITY before execution of the <br />Development Pen -nit by and between the City of Ramsey and First Phoenix Group. LL <br />and before the AN; NN`ill issue the ildin Pen t for tone'v River. <br />19. Trail Development Fees. The current trail development fee i 00 per dNvellino unit. <br />The CITY has approved a credit to the Trail Development Fee for 67.E linear feet of off - <br />site Construction at are amount t of S;0 per linear foot 75 feet x S`0 per linear foot <br />S20.2150). The amount due for the Plat before the credit is Nineleen Thousand EiLlht <br />Hundred Dollars and No Cents s 00 x units T 19. . 0 . Ay the costs o <br />onsir uclion excee(i ire Trail Development Fee, no Trail velol?n7 w Fee j ayniew is <br />reynire . PERMITTEE is constructing trail improvements to cormect the existing trail <br />along I loxN-�then Boulevard through Lot: I . These improvements located on tlic remainincy <br />parcels to be consolidated into the e istilic, parcel shall be considered off -site <br />improvements and actual construction costs shall be eligible for credit aclainst Trail <br />Development Fees- as indicated on F ibit A attached hereto. The rate in effect the time <br />this Contract is executed shall be collected and paid to the Cliv before execution of the <br />Development Permit bv and between the City of Ramsey and First Phoenix Group. Ll. <br />and before the it-' \vill issue the Buildinay Permit for Slonev RiVer. <br />20. Water and Sanit ry Sewer Connection (Trunks) Fees. The current water connection fee i <br />S2,308 per unit. The CUITent sanitary sex er connection fee is S1.318per unit. The total <br />aMount due on the Plat is Seventv Six Thousand Three 1-lundred and Elalht Dollars and <br />No Vents ($2,308 x 33 units = 7 ,1 4. for water trunk- fees. The total aillount due on <br />the Plat is Forty Three Thousand Four Hundred Nineiy Four Dollars and No Cents <br />[SI..'"3, I X 3 units = 3,4 4.(0 . The rate in effect the time this Contract is e ecut d <br />Shall be collected and paid to the CITY before execution of the Development Permit by <br />and betty een the City, of Ramsey and First Phoenix, Group.. LLC and before the City, will <br />issue the Buildinc Penmt for tonev River. <br />ner. <br />21. Water and Sanitary ewer Lateral Fees. The current \eater lateral fee is S.2.308 per <br />corn ction. The current sanitary seN er lateral fee is s 1.31 per connection. The total <br />amount due on the Flat. before credits are 2riven. is I'N elve Thousand aline Hundred <br />TN-venty SIN Dollars and 1 To Cents 09.102 x I connection = S9.102] [S',824 I <br />connection = S3.8241 = S12,926.00). lie Engineer's Estimaic to exiend thcs e sei-vices <br />ceeis this uniount. then fore 1,,Vaier are . anilur-y �5eiver Lateral Fees will non be clue. <br />The rate of said fee in effect at the time this Contract is executed shall be collected. The <br />cost to extend these serN ices to the proposed building shall be credited to these fees. <br />2 Stormwater Mana�,)inert Fee. The current storm water manaLlement fee is ,4 � per <br />commercial acre. The amount due for the Plat is Fifteen Thousand Three Hundred f=orly <br />Fire Dollars acid No Cents (S465) x 33 units = I ,34 .00 . The rate in effect the time <br />this Contract is executed shall be collected and paid to the CITY before execution of the <br />Page 8 of <br />