Laserfiche WebLink
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />(7) <br />b. Scaled maps and plans, dimensional renderings, maintenance agreements, and other <br />materials that identify and describe: <br />1. Primary conservation areas; <br />2. Public river corridor views; <br />3. Buildable area; <br />4. Existing and proposed topography and drainage patterns; <br />5. Proposed storm water and erosion and sediment control practices; <br />6. Existing and proposed vegetation to be removed and established; <br />7. Ordinary high water level, blufflines, and all required setbacks; <br />8. Existing and proposed structures; <br />9. Existing and proposed impervious surfaces; and <br />10. Existing and proposed subsurface sewage treatment systems. <br />Non conformities. <br />a. All legally established nonconformities as of the date of this chapter may continue <br />consistent with Minn. Stats. § 462.357, Subd. 1e. <br />b. New structures erected in conformance with the setback averaging provisions of <br />section 117-148(f)(3)d (structure and impervious surface placement) are conforming <br />structures. <br />C. Site alterations and expansion of site alterations that were legally made prior to the <br />effective date of this chapter are conforming. Site alterations include vegetation, <br />erosion control, storm water control measures, and other nonstructural site <br />improvements. <br />d. Legally nonconforming principal structures that do not meet the setback requirements <br />of section 117-148(f)(3) (structure and impervious surface placement) may be <br />expanded laterally provided that: <br />1. The expansion does not extend into the shore or bluff impact zone or further into <br />the required setback than the building line of the existing principal structure (See <br />Figure 5); and <br />2. The expanded structure's scale and bulk is consistent with that of the original <br />structure and existing surrounding development. <br />Figure 5. Expansion of Nonconforming Structure <br />Expansion of Nonconforming Structure <br />���, <br />Expansion <br />Expansion=5aX4k <br />n Mkt Yr <br />allowed <br />not allowed <br />OHWL <br />Structure <br />»...,.::.. <br />"<'is-s�_n•,✓•:Jc_<s In.: "r:+^.^.:m:^,:+i*s ::>:a: >�'.. ..... ... <br />Q. `.�. ;;...:. tr <br />�Jet�. <br />Shore Impact one <br />, r=s�i, <br />.:� .a�:�xs;..=:�n,cr`:"Zig, s.- <br />s t ,.x5:1?Rimm=c; ..:.:�: : '<: "<m'¢•'ssu'.a,%':gi?e <br />..:;. ._>_n,� �.,_..,, x..�..:..;:::.�;,-�•..?�?�?n?=ir.<���,:-..�;�:;-3:.�:;::;:�r:.....a,��. <br />p <br />54 /4 f structure <br />( o <br />ors <br />e=�<is <br />......_.'=s:''�z3s,T..•..o...Y.>s.,.uEs'£r.� ve.,r....,.mt <br />................................! ;.„,s.::. ;_.. . n.m, ".. ? �<r?•YlLiw:�'H <br />::,.,.::,�:,;,=.E::';:;.. i•.:,.,, .=,.. <: _ ?,r <br />setback <br />::.:.....::::..... Q .. <br />2,::::::::::.:.::.::: in <br />OHWL <br />River <br />(8) Notifications. <br />a. Amendments to this section and to the MRCCA plan must be submitted to the <br />Commissioner as provided in Minnesota Rules, part 6106.0070, Subp. 3, Items B-I. <br />Page 95 of 147 <br />