Laserfiche WebLink
o Example projects <br />o Project checklists <br />• Permit List and Map https://www.mass.gov/lists/closed-landfills-with-permits-for-renewable- <br />ee n�-y <br />o Lists of tens of projects with permitting information <br />• Summarized top criteria for evaluating and developing solar on brownfields in Massachusetts are <br />listed as follows. Note, they are not weighted, but all considered important and necessary for <br />evaluation prior to developing these projects. <br />o System ownership <br />■ Experience with solar development on brownfields <br />■ Experience with brownfields <br />■ Experience with operations and maintenance <br />o Power purchasers <br />■ Utilities/ electric cooperatives <br />■ Municipalities <br />■ Behind -the -meter <br />■ Hybrid ownership for power purchase <br />o Power purchase arrangements and incentives <br />■ Power purchase agreements (PPAs) <br />■ Net Metering <br />■ State incentives <br />■ Other <br />o Proximity to transmission and distribution Lines <br />o Environmental factors <br />■ Cap age and settlement <br />■ Permitting challenges — political or environmental <br />- N I M BYism or project opposition <br />- Key natural resources: threatened/endangered species; wetlands; other <br />protected/regulated resources <br />B4 <br />